ASHRAE 188P open for public comment

ASHRAE 188P is open for a public review. Standard 188P, Prevention of Legionellosis Associated with Building Water Systems, specifies what must be done to control the spread of legionellosis.

01/31/2013


Standard 188P, Prevention of Legionellosis Associated with Building Water Systems, specifies what must be done to control the spread of legionellosis. The standard helps facility managers/owners understand how to apply the available information on Legionella effectively in order to prevent cases of legionellosis associated with building water systems.

The proposed standard underwent an earlier public review in June 2011 and is currently open for a third public review until March 11, 2013. For more information, visit www.ashrae.org/publicreviews.

William McCoy said the committee received more than 150 comments during the 2011 review. The input helped the committee in clarifying many aspects of the standards. Changes being proposed to the third review based on that input, include:

  • Clarifications made to definitions in Section 3, Definition of Terms and a new term was defined.
  • Clarifications made to Section 5, Risk Characterization. Those changes were substantive because building characteristics were reorganized into two subsections for clarity, subsections 5.2 and 5.3.
  • Reorganization of Table 1, Determining Preventative Measures Required for Buildings. The improvements reference two subsections of Section 5 (Sec 5.2 and 5.3).
  • Creation of a new subsection, 7.4, Water System Treatment and Management Program, in Section 7. Commenters indicated there should be specifications for a “water system treatment and management program” for buildings with none of the risk characteristics (now listed in Sec 5.2) but with any of the equipment specified (now listed in Sec 5.3),.
  • Clarifications to Section 8 regarding wording, references, cited regulations and informative notes.

Compliance with the standard requires facility managers/owners to formally take responsibility for controlling Legionella in their building water systems, while at the same time acts as a defense against accusations of negligence in those cases which are caused by the hazard from unknown sources.

Standard 188P also covers the potable water system in buildings, which are not treated as often as cooling towers, and will hold facility managers/owners accountable for properly managing the entire building water system both potable and utility water.

The standard differs from ASHRAE Guideline 12, Minimizing the Risk of Legionellosis Associated with Building Water Systems, in that while the guideline gives recommendations about how to treat various building water systems, the standard specifies the practice of exactly what must be done with all those recommendations.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.