Enhanced automation architecture for the Trans Alaska Pipeline System provided capability to remotely operate the system, incorporating Modbus TCP in its industrial Ethernet network technology. See diagram.

02/05/2009


Portland, ME – In an industrial Ethernet networking application, Alyeska Pipeline Service Co. (APSC) operates the Trans Alaska Pipeline System (TAPS), 800 miles from Prudhoe Bay through rugged terrain to Valdez, the northernmost ice-free port in North America. 



APSC has transported more than 15 -billion barrels of oil via TAPS since pipeline startup in 1977. Automation software that connects to the Ethernet, whether running on commercial or industrial hardware, is already inherently “rugged” in nature with built- in retry logic and error correction as common functionality, Kepware says.

A recent project enhanced the TAPS automation architecture and provided the capability to remotely operate the system. APSC identified that installing new equipment would alter hydraulic and operating parameters, explained Tony Paine, CTO of Kepware . To predict and modify programming and operating configurations prior to installation, APSC engineers decided to create a rugged simulated I/O and valve system, mirroring live conditions.
Components, explains Paine, include Allen-Bradley ControlLogix PLCs by Rockwell Automation , ICS Triplex PLCs , I/O simulator by Telvent , and a valve simulator configured in a UCOS distributed control system (DCS).

See great pipeline photos at www.alyeska-pipeline.com

See more of this image and other great pipeline photos , at www.alyeska-pipeline.com.

To complete the system APSC engineers needed to link these virtual control components and I/O components, Paine says. The system integrator used Kepware’s OPC server KepServerEX with DDE Client driver plug-in and Modbus TCP/IP master driver plug-in. Kepware’s OPC server bridging product LinkMaster pumped data among connectivity components.
The configuration (see diagram) mimicked lab-based controllers and field I/O to “test and troubleshoot certain aspects of our system before the programming reaches the field,” says Jim Foster, the lead APSC engineer on the project. “The simulation system will also be used to test and qualify the control center operators in conjunction with other training tools,” Foster added.
www.kepware.com

– Edited by Mark T. Hoske , editor in chief
Control Engineering News Desk
Register here .





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.