Several resources provide guidance on both active and passive fire protection.

07/14/2014


 

 

The building and fire codes do not call out specific fire safety goals; their main objective is life safety of occupants and firefighters. Preservation of the primary structure and neighboring structures is a resulting benefit.

Some occupancies, such as I-occupancies (prisons, hospitals), where occupants may be unable to evacuate themselves due to incarceration or physical disabilities, limit fire protection strategies to “defend in place” and require both active and passive fire protection.

Because of the documented effectiveness of functioning and adequate fire sprinkler systems, the IBC allows a reduction of some passive fire protection systems in some occupancies where full fire sprinkler systems are installed throughout a building. These usually mean full NFPA 13 systems. If a residential building of four stories or less is otherwise eligible for an NFPA 13R system, if a reduction of the passive systems is desired due to the installation of a fire sprinkler system, the IBC, in most but not all instances, requires that the fire sprinklers be installed “throughout” the building, meaning an upgrade to an NFPA 13 system. Keep in mind that local authorities having jurisdiction (AHJ) may consider that many of the alternate methods of fire protection identified in IBC 904 (clean agent systems and the like) do not qualify for these “trade-offs.”

Where fire sprinklers are installed, some of the passive system trade-offs allowed by the 2012 IBC include the following. State and local amendments may affect them.

  • Building height increases of 1 story and up to 20 ft. (IBC 504.2).

  • Building area increases of up to 300% for 1-story buildings and 200% increases for multiple-story buildings (IBC 506.3).

  • Unlimited areas in 1- and 2-story buildings for group B, F, M, and S buildings (IBC 507.3 and 507.4).

  • Occupancy separations: Up to a 1-hour reduction in the fire-resistance rating of fire separation walls (IBC 508.4).

  • Fire-resistance rated construction: Fire sprinklers can substitute for 1-hour rated construction, unless the fire sprinkler systems is otherwise required in Type IIA, Type IIIA, and Type V-A construction (IBC Table 601e).

  • Corridor rating: Fire-resistance rating deleted (IBC Table 1018.1).

  • Balcony ratings: Balcony construction type and fire-resistance rating and aggregate width modified (IBC 1406.3).

  • Exterior wall openings: Sprinklered maximum allowable area of unprotected openings is allowed to be the same as for protected openings (IBC Table 705.8).

  • Exterior wall openings: Where buildings are provided with sprinklers and water curtains are installed at the exterior, the protection requirements of openings in an exterior wall may be deleted (IBC 705.8.2).

  • Exterior wall openings: Flame barriers protecting window separations of 5 ft or less may be deleted where sprinklers are installed throughout (IBC 705.8.5).

  • Fire walls: Fire sprinklers allow certain modifications in fire walls (IBC 706.5(3) and 706.8).

  • Fire barriers: Permitted openings in fire barriers may be increased if both fire areas are sprinklered (IBC 707.6).

  • Draftstopping: Floor/ceiling assembly draftstopping requirements at 1000 sq ft and attic and concealed space draftstopping at 3000 sq ft are eliminated (IBC 718.3.3 and 718 4.3).

  • Interior wall and ceiling finishes: May be reduced to a lower category (IBC Table 803.9).

  • Interior floor finishes: Requirements reduced for floor finish materials in vertical exits and exit passageways and exit access corridors (IBC 804.4.1).

  • Accessibility stairs and areas of refuge: 48-in. Americans with Disabilities Act (ADA) egress stairs and areas of refuge may be deleted (IBC 1007.3).

  • Elevators: Elevators are not required to serve as ADA means of egress (IBC 1007.2.1).

  • Elevators: Elevator hoistway venting may be deleted in some occupancies (IBC 3004.1).

  • Fire alarm: Multiple manual pull stations are not required when sprinklers are provided in many occupancies (IBC 907.2).

  • Fire alarm: Heat detectors are not required (IBC 907.4.3.1).

  • Fire alarm: Locations allowed by NFPA 13 to omit sprinklers may omit smoke detectors if sprinklered (IBC 907.2.13.1.1).

  • High-rise buildings: Reductions in many fire-resistance ratings where sprinkler floor control valves are supervised and water flow initiating devices connected to the fire alarm system are provided (IBC 403.2.1).

  • High-rise buildings: Fire barrier walls enclosing vertical shafts (other than exit enclosures and elevator hoistway enclosures) are allowed to be reduced to a 1-hour fire-resistance rating where automatic sprinklers are installed at the top and at alternate floor levels within the shafts (IBC 403.2.1.2).

The National Fire Sprinkler Association’s “The Fire Sprinkler Guide,” edited by Jeffrey M. Hugo, is an excellent resource for a fuller listing of allowable trade-offs.

NFPA’s “Fire Protection Handbook” is another excellent source of further information on active and passive fire protection. 


Kathleen Roach is associate principal and senior fire/life safety designer at Interface Engineering. She has approximately 20 years of experience in fire protection design and strong technical knowledge of codes, standards, and recommended practices. Her work includes specification and design for fire suppression systems and fire/life safety reviews.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Hannover Messe 2016: Taking hold of the future - Partner Country status spotlights U.S. manufacturing; Honoring manufacturing excellence: The 2015 Product of the Year Winners
Inside IIoT: How technology, strategy can improve your operation; Dry media or web scrubber?; Six steps to design a PM program
World-class manufacturing: A recipe for success: Finding the right mix for a salad dressing line; 2015 Salary Survey: Manufacturing slump dims enthusiasm
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Warehouse winter comfort: The HTHV solution; Cooling with natural gas; Plastics industry booming
Managing automation upgrades, retrofits; Making technical, business sense; Ensuring network cyber security
Designing generator systems; Using online commissioning tools; Selective coordination best practices

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This article collection contains several articles on the vital role that compressed air plays in manufacturing plants.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
click me