Achieving daylighting credits for LEED


Creating the simulation and analysis 

Simulation details include several items: 

Site location:

  • The building is located in Northwest Chicago, Illinois. By closest approximation, the daylight model was located at a latitude 42 deg north and longitude 88 deg west.
  • All of the assessment results in this study were conducted on an analysis plane positioned 30 in. above each finished floor. The date and times for the simulation were set on Sept. 21 (fall equinox) at 9 a.m. and 3 p.m.
  • The luminance sky distribution set in AGi32 lighting simulation software was clear sky. 

Table 1: Surface properties. Courtesy: expSurface properties: The visible light reflecting properties of the internal surface finishes and transmission properties of the glazing for the individual spaces were assigned according to the surface finish and glazing schedule provided by architects (see Table 1). 

Space classification: The following are selected as regularly occupied areas (as defined by USGBC) because they are spaces where one or more individuals normally spend time (more than 1 hour per person per day on average) seated or standing as they work, study, or perform other focused activities inside a building. 

Daylighting analysis, including:

  • Building spaces: The combined floor area of the regularly occupied spaces in the building is approximately 1462 sq ft. Most of the regularly occupied offices in the building mainly face south or east. They receive direct daylight during the evaluation time and therefore have the highest daylight levels of the offices in the building.
  • Iso-contour plan and calculation summary (see Figure 1). 

Achieving the goal 

The daylight levels for all regularly occupied spaces were assessed individually for Sept. 21 at 9 a.m. and 3 p.m. using architectural drawings and schedules for the opaque surface finishes and glazing. The sun position and sky distribution required for analyzing the probability of achieving LEED daylight and views credit is a good criterion for evaluating the overall daylighting performance because the sun is at low angles and it is a mid-season sun.

The daylighting performance of the prototype building is balanced with even daylight distribution. All the spaces analyzed were comprised of relatively small floor areas. In this example, the daylight analysis results show the building has 85% of the regularly occupied space floor area of 25 to 500 fc at 9 a.m. and 75% at 3 p.m. Because this result meets the minimum requirement for the LEED EQc8.1: Daylight and Views - Daylighting credit, the proposed design is anticipated to achieve 1 point for this credit.

Siva Haran is a senior electrical engineer and project manager at exp. He is an advisory member of Sustainable Lighting Committee of IES. He has extensive experience in designing lighting and electrical systems for commercial, institutional, light industrial, and residential projects.

See tips for analyzing daylighting, as well as a glossary/definitions below.

<< First < Previous 1 2 3 Next > Last >>

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
A cool solution: Collaboration, chemistry leads to foundry coat product development; See the 2015 Product of the Year Finalists
Raising the standard: What's new with NFPA 70E; A global view of manufacturing; Maintenance data; Fit bearings properly
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Upgrading secondary control systems; Keeping enclosures conditioned; Diagnostics increase equipment uptime; Mechatronics simplifies machine design
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.