A beginner’s guide to lean: Lean lessons learned

Now that we have begun a new year, it’s a good time to reflect on lean lessons learned in 2014.

02/25/2015


Now that we have begun a new year, it’s a good time to reflect on Lean lessons learned in 2014.

My students conducted six Lean Workouts with various sponsor organizations this year. These organizations ranged from GM to several small manufacturers to our first non-profit organization, the Detroit Historical Society. The student teams and their sponsor organizations learned a lot of Lean lessons.

Four of the key Lean lessons learned were:

1. Be precise and detailed in your observation and analysis of the gemba.

As I tell my students, you’re not tourists strolling through the plant. You are keen observers writing notes and taking pictures so that you can get the most accurate facts possible and uncover waste. One of the student teams that was conducting its Lean Workout on the gauge calibration outsourcing process of a CNC machining company actually walked with the worker and counted the 685 footsteps he made every time he performed the outsourcing process. That is what I call precise observing of the gemba! That level of precise observation facilitated their team’s ability to understand the current condition, identify the root causes and design a target condition that reduced waste from 49 percent of the process to 3 percent.

2. Standardize, standardize, standardize!

Then manage to the standards. As I have written before, “the least sexy part of Lean is standardized work. But standardized work is the linchpin of the Lean system. Where there is no standardized work, there is no process discipline, team member accountability, reliable data, continuous improvement or Lean sustainability. In many instances, the student teams found non-standard processes or, more often, no standards at all. Everyone was doing his or her own thing, and the folks at the end of the process were picking up the pieces and fielding customer complaints. I don’t know what is more important — developing standards or managing people to follow the standards. But I do know that both are critical. I tell the students to only develop standards that the people doing the work can easily understand and agree to follow and the supervisors can and will monitor and enforce. Don’t get ahead of the organization’s culture and employees’ capabilities. There is always the opportunity for future kaizen.

3. Have quality, cost and/or delivery (QCD) problems?

Look at the front end of the process first. In the manufacturing companies the students worked with this fall term, the businesses were experiencing problems with wrong customer shipments, raw material “shortages” and long lead times. Most of the so-called “data” pointed to the plant floor. But after precise and detailed observation and analysis of the current conditions, the student teams discovered the root causes to really be in the front end or the order entry, receiving and initial inspection processes. Their Lean Workouts ultimately focused on eliminating the waste and developing standards in the order entry process, the raw materials receiving process and the initial inspection process — the QCD problems were greatly impacted as a result.

Mark Doman is a professor in Lean studies at Oakland University in the department of organizational leadership. Courtesy: AME

4. Leaders must take the lead in employee communication and training to build buy-in and support for your target condition.

Employee communication and training led by the leaders of the organization are a must for any implementation plan. Just because your team comes up with a great new Lean target condition and absolutely ingenious countermeasures doesn’t mean that the employees doing the work and/or supervising the work and/or running the plant will automatically change their behavior overnight. Changing ingrained adult behavior, let alone longstanding organizational habits, is extremely tough to do. As Dennis Pawley, the Chrysler lean pioneer, told my class, “To really obtain employee buy-in, my experience shows that for every hour leaders initially budget to communicate change, multiply that 10 times to effectively achieve explanation and acceptance of the change.”


I hope these Lean lessons learned help you and your organizations on your Lean journeys. 

Mark Doman is a professor in Lean studies at Oakland University in the department of organizational leadership. He is the author of “A new Lean paradigm in higher education: A case study.” Quality assurance in education, Vol. 19 No. 3, 2011, “How Lean ready are you?” Target, Vol. 28 No. 2, 2012 and “The beginner’s guide to Lean” series. His email address is doman@oakland.edu. This article originally appeared on AME Target Online Magazine, AME is a CFE Media content partner.



The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
Doubling down on digital manufacturing; Data driving predictive maintenance; Electric motors and generators; Rewarding operational improvement
2017 Lubrication Guide; Software tools; Microgrids and energy strategies; Use robots effectively
Prescriptive maintenance; Hannover Messe 2017 recap; Reduce welding errors
The cloud, mobility, and remote operations; SCADA and contextual mobility; Custom UPS empowering a secure pipeline
Infrastructure for natural gas expansion; Artificial lift methods; Disruptive technology and fugitive gas emissions
Mobility as the means to offshore innovation; Preventing another Deepwater Horizon; ROVs as subsea robots; SCADA and the radio spectrum
Research team developing Tesla coil designs; Implementing wireless process sensing
Commissioning electrical systems; Designing emergency and standby generator systems; Paralleling switchgear generator systems
Natural gas engines; New applications for fuel cells; Large engines become more efficient; Extending boiler life

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
Featured articles highlight technologies that enable the Industrial Internet of Things, IIoT-related products and strategies to get data more easily to the user.
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Maintenance Manager; California Oils Corp.
Associate, Electrical Engineering; Wood Harbinger
Control Systems Engineer; Robert Bosch Corp.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me