5 total productive maintenance (TPM) myths
TPM has been around industry for over 25 years, and yet is still an new concept to many organizations. There are many myths and misunderstandings about TPM that circulate industry.
Greg Folts, President, Marshall Institute
By Greg Folts, President, Marshall Institute
TPM has been around industry for over 25 years, and yet is still an new concept to many organizations. There are many myths and misunderstandings about TPM that circulate industry. Here are few myths and the correlating truths:
Myth #1 - TPM is all about operator based maintenance
WRONG. While a solid TPM process includes operator care of equipment, it is not the only element. We must combine solid maintenance practices, training development, equipment improvement, and equipment design excellence. Operator care is critical, but alone will not result in significant reliability improvement.
Myth #2 - TPM can be driven by one passionate champion
While we need a champion, this passion must be developed into a coalition for change. This is the only way to drive the deep roots required to weather the seasons of the business cycle. In addition we should develop floor level champions that own the process for a specific area of the plant.
Myth #3 - Many Kaizen workshops strung together will result in sustainable change
This simply will not get us to our destination. We need strategy and a mix of quick wins and system improvements. Do not confuse activity with accomplishment.
Myth #4 - TPM will become so much a part of the culture that we will not need to focus on the process any longer
I hate to be the bearer of bad news, but think of TPM like a garden. Weed are always trying to creep back in. A gardener pulls the weeds as they pop up to keep the pretty rows and organized garden. The weeds of your plant are dirt, clutter, breakdowns, disorganized parts. Systems will help maintain the order, but we must have people tending to our progress.
Myth #5 - Teams are a waste of time and resources
It is true that poorly run, non -ocused teams are a waste. However; strong focused teams are vital to change management and strategy deployment. To manage the change of many years of culture, we use teams that span the organization horizontally and vertically. People will support change they understand and help design. They also know how to adapt the TPM principles to best fit their culture. In summary, drive a deeply supported team-lead culture change to achieve sustainable results in your organization.
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












