12th District Police Station

New construction; 12th District Police Station; Primera Engineers Ltd.

08/15/2013


This image shows a rendering of the 12th District Police Station. Courtesy: Primera EngineersEngineering firm: Primera Engineers Ltd.
2013 MEP Giants rank:
91
Project:
12th District Police Station
Address:
Chicago, United States
Building type:
Office
Project type:
New construction
Engineering services:
Automation & Controls, Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
June 2009 to June 2012
Engineering services budget:
$400,000
MEP budget:
$1.25 million

Challenges

As part of the City of Chicago's "Neighborhood Alive" program, the Public Building Commission is building 12 new police stations across the city to replace existing facilities. These new prototype stations are 42,000 sq ft, twice that of the original stations. Primera Engineers was charged with developing an alternative to the original prototype design that included a geothermal system.

Creating an alternate prototype presented Primera with multiple engineering challenges, including the need to redesign the original prototype to include a geothermal and rainwater harvesting system without altering the overall building design or MEP spaces. In addition, the 88-well geothermal system was one of the largest urban designs put in place. Primera was able to integrate it seamlessly into the building footprint without the need to alter the usable areas, adjacencies, or program functions. Since the building is both a 24-hour facility and a cooling center, several redundancies for systems needed to be included in the design due to the critical nature of the station. This challenge complicated the design process but ultimately increased the reliability of the system.

Solutions

Primera developed an alternative to the original prototype design that included a geothermal system. The heating and cooling for the District 12 station is provided using an 88-well, closed loop geothermal field, which was placed under the adjacent 250-space parking lot. Primera also provided a modular water-to-water heat pump system that could heat and cool simultaneously and ultimately provide excellent redundancy for the facility. This modular system also allowed for the new systems to fit without altering the station design. Lastly, Primera was able to modify the building's central plant while utilizing the same airside system design. The modified design reduced the learning curve for maintenance personnel and end users due to their familiarity with the original system and a need to only learn how to work with the revised plant.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.