12 control engineering benefits of QBS, qualifications-based selection, for services

The fee for technical skills and experience provided by a high quality engineering firm amounts to approximately 1% of the total cost of the project. Yet these services are critical to determining the other 99% of the project's life-cycle costs, as well as the quality of the completed project. Qualifications-based selection (QBS) can help.

06/04/2009


 

Microsoft offers free clip art.
The fee for technical skills and experience provided by a high quality engineering firm amounts to approximately 1% of the total cost of the project. Yet these services are critical to determining the other 99% of the project’s life-cycle costs, as well as the quality of the completed project.

To help balance cost and quality, U.S. government established qualifications-based selection (QBS) in 1972 for when federal agencies use architectural and engineering services. Those other than the federal agencies benefit from using QBS.

12 ways QBS can to improve your project

 

Control Engineering surveyed packaging OEMs about selection of system integration services.

In selecting engineering services, the process of QBS:

-Creates a competitive procurement process in which engineering firms submit qualifications to the procuring agency (the owner), the owner assesses the expertise of the competing firms;

-Chooses the most qualified firm to negotiate the project scope and associated fee;

-Ensures proper attention is given to control engineering services critical to lifecycle project success, such as support, computer security, backup processes, and regulatory compliance with control panels.

-Recognizes that cost is an issue, but not at the expense of the skill of the practitioner and the quality of related work, which determines the true value of their services.

-Avoids selecting an engineering firm based on the lowest bid; the cheapest design is bound to produce a poor quality project;

-Weighs proposals first on competence, creativity and performance, followed by negotiation of a fair and reasonable price with the most-qualified firm, allowing flexibility to select the professional design firm best suited for the task.

-Creates an atmosphere of trust where the owner and a firm’s engineers can develop a detailed scope together, avoid miscommunication, and establish a mutually agreed upon price.

-Establishes a relationship that allows the owner and design professional firm to work together to develop the project scope and determine alternative materials and designs that will minimize long-term operational and maintenance costs.

-Determines costs early in the project, so owners receive a clear indication of overall financial requirements.

-Says that if the owner and most-qualified firm cannot reach an agreement on project scope, schedule, and budget, the owner then negotiates with the next-most-qualified firm.

-Has been adopted by 44 states and hundreds of localities.

-Is endorsed by the American Bar Association, the American Public Works Association, the Associated General Contractors, and all major design professional associations.

For more, see related article in June 2009 Control Engineering, North American print edition .

- Vance VanDoren , Ph.D., P.E., is consulting editor with Control Engineering , www.controleng.com . Ron Brenke is QBS manager at American Council of Engineering Companies– Michigan, www.QBS-MI.org . Edited by Mark T. Hoske, Control Engineering editor in chief, System Integration Monthly eNewsletter

 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.