Winds power load balancing: Ultracapacitors help
Winds of change are blowing for clean technology energy storage methods to help balance renewable energy sources coming online. Ultracapacitors can help balance the grid as more wind power comes online.
Brendan Andrews
Wind power is increasing as traditional energy markets are influenced by regional instabilities and, with recent events in Japan, nuclear power seems less attractive politically in many areas. The wind turbine market also is taking advantage of rapid technology advances. [See article on direct-drive wind turbines.] Manufacturers once struggled to cost-effectively capture consistent wind-generated power, but a shift in energy storage practices has resolved that problem. Ultracapacitors are replacing battery-driven energy storage systems and introducing new efficiencies in the wind turbine market, helping to balance the electricity grid.
While the rotor blades of a turbine can be adjusted to respond to current conditions, this changeability creates waste in battery-powered systems, which are sized to meet the highest possible power demands. Batteries also struggle under moments of high peak power and perform poorly in low temperatures. With short life spans, batteries force maintenance crews to frequently swap out components under potentially dangerous conditions.
Ultracapacitors resolve those problems because they:
Have a long life span. Batteries last 2 to 4 years, but ultracapacitor life span is more than 10 years.
Can withstand extreme temperatures. They operate optimally at a temperature range between -40 C and 65 C, whereas batteries function best at -20 C to 40 C.
Have impressive cycling capability. A battery can offer only 10,000 to 50,000 cycles compared to an ultracap’s million-plus.
Are dropping in cost. The cost of ultracaps has decreased by 99% in the last 10 years. During the same period of time, battery price fell by only 30% to 40%.
For the above reasons, new wind turbine installations will favor ultracapacitors to control blade pitch, ensure optimum positioning, and capture wind speed for better performance and safety.
Brendan Andrews is vice president of sales and marketing at Ioxus Inc. Edited by Mark T. Hoske, CFE Media, Control Engineeringhttp://www.controleng.com
- Posted by Chris Vavra, Control Engineering, www.controleng.com
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












