Doing an annual audit of all your maintenance activities for the last year may sound tedious, it is a good thing to do and can help you identify problem areas, scope for improvement and where you are doing really well.

  1. Collect information on all the work orders you did last year. If you have maintenance management software this will not be hard to do. The software should be able to give you a variety of analysis reports for specific periods so that you can see how you are doing. In addition you may be able to do an export of all work orders for the last year to do more detailed analysis with other tools – e.g. export to a comma delimited file, open with spreadsheet software (such as Microsoft Excel) and do more complex analysis & charting.
  2. Separate unplanned maintenance from planned/ preventative maintenance. Group all the maintenance work that was done into two “buckets” or categories – unplanned/ breakdown maintenance and planned/ preventative maintenance. These are two different types of data and they should be analyzed separately.
  3. Under unplanned work orders look for equipment that seems to be failing frequently or require a lot of unplanned maintenance. This may be a sign that the equipment needs replacement or maintenance is not being done correctly. If problems seem to occur more frequently after certain maintenance team members are doing the maintenance, it may be a sign that the maintenance work is not being done correctly. They may be skipping steps or do not have the training or experience to identify potential issues that will cause future problems. Another clue is if the work orders are being flagged as problem work orders – they are taking too much time to complete or are getting delayed because maintenance technicians are finding additional problems. Another cause could be bad spare parts. If your suppliers are sending parts that fail before their expected life – you are going to see a lot of unexpected maintenance whenever they fail!
  4. Under planned/ preventative maintenance work orders look for the equipment that seems to be taking the most of your time and money. It is possible that the equipment can be replaced with newer equipment that needs less preventive maintenance. Get an idea of how much such equipment is costing you to maintain and see if cheaper alternatives are available. Besides this check and see if some of the preventive maintenance is overkill – review manufacturer’s recommendations and see if you are doing more than is necessary.
  5. Check your maintenance parts usage. Your maintenance software should be able to give you reports of parts you have used over the year. See if you can identify possible bad batches of parts or suppliers who provide poorer quality parts. Identifying bad parts can help you identify equipment that may need pre-emptive maintenance because maintenance was done with bad parts from a bad batch. You can also drop suppliers that tend to sell poor quality parts. Spare part costs are a very significant part of most maintenance budgets and improving parts management can help save a lot of money (and time since you will have less breakdowns because of bad parts).

What You Should Learn From The Audit

At the end of your audit you should have a good idea of potential problem areas, where you can improve and where you are doing well. This kind of information becomes more valuable as you keep repeating these audits – you can see if you are performing better from year to year. While reviews at shorter periods e.g. quarterly or semi-annual are also useful, a yearly audit can help smooth out performance fluctuations caused by seasonal changes. Examples of seasonal changes are equipment running at maximum load to satisfy holiday demand or HVAC issues at the start of winter or summer – these can cause maintenance spikes that can make it hard to compare performance against a prior quarter.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.