SEARCH Archives
Loading
Sponsored by:

UPS for backup power

Emerson Network Power has released 160 and 200 kVA ratings in its Liebert NX with Softscale double conversion UPS platform, designed for midsize businesses seeking a backup power solution that grows incrementally without requiring infrastructure renovation.

01/18/2011


Emerson Network Power has released 160 and 200 kVA ratings in its Liebert NX with Softscale double conversion UPS platform, designed for midsize businesses seeking a backup power solution that grows incrementally without requiring infrastructure renovation. Now spanning the range of 40 to 200 kVA, the Liebert NX product line includes optional maintenance bypass/power distribution cabinets. A single maintenance bypass/distribution cabinet provides complete wraparound bypass for a UPS system, and may also be used to provide input and output voltage transformation. The cabinets are available with panel board or subfeed output distribution. The Liebert NX UPS is available with front and rear access for easy integration into a row of racks, or front-only access for installation against a wall. The Liebert NX UPS may be located on a raised or solid floor, and provides maximum wiring flexibility by including provision for bottom or overhead cable entry.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.