The Mob Museum (National Museum of Organized Crime and Law Enforcement)

System overhaul; The Mob Museum (National Museum of Organized Crime and Law Enforcement); Westlake Reed Lesosky

08/15/2013


The $42 million Mob Museum for the city of Las Vegas rehabilitates the historic former U.S. Post Office and federal courthouse into a contemporary museum, cultural destination, and centerpiece for downtown, while preserving its historic character and spacEngineering firm: Westlake Reed Leskosky
2013 MEP Giants rank:
81
Project:
The Mob Museum (National Museum of Organized Crime and Law Enforcement)
Address:
Las Vegas, Nev., United States
Building type:
Art/museum venue
Project type:
System overhaul (e.g., mechanical system upgrade, fire protection system overhaul, etc.)
Engineering services:
Automation & Controls, Code Compliance, Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
February 2007 to February 2012

Challenges

Westlake Reed Leskosky was retained by the City of Las Vegas to plan, design, and implement the expansion and adaptive reuse, including exhibit fit-out, of the 1933 Las Vegas U.S. Post Office and Courthouse as a new museum on the history of organized crime and law enforcement and the development of Las Vegas. The $42 million project developed the building and site as a contemporary cultural destination in the heart of downtown Las Vegas, while maintaining the historic integrity of one of the few buildings in the city listed on the National Register of Historic Places.

A major challenge of the project was fitting a full, modern museum program into the existing building, while maintaining the integrity and character of the historic spaces. A key challenge involved the sensitive integration of new, state-of-the-art mechanical and electrical systems. The building was not originally designed for air conditioning and has historic plaster ceilings throughout, with no above-ceiling space to conceal equipment. Additionally, historic preservation concerns meant that no equipment could come within 4 ft of any window, in order to preserve the views and natural light into the building. Also, as a museum, the building needs to accommodate more occupants that it did in its former use, requiring more cooling capacity, ductwork, and air handling units. Finally, the building's program did not allow room for the new air handler units within the building, forcing them to be placed on the roof. However, seeing the air handling units would change the relationship of the historic building to the sky, which could not be allowed. In addition, the existing structure did not have the electrical distribution to serve a modern museum building use.

Solutions

The solution was to carefully locate all mechanical systems, including ductwork, fire protection piping, electrical ductbanks, and low-voltage wiring, away from windows and out of spaces of primary historical significance. This allowed the most important historic spaces to remain unaltered. However, this caused severe congestion at the ceilings of the less significant spaces. Thorough coordination among the design team and with the contractor was required to ensure that all systems would fit within the space allowed. The new roof-mounted air handler units were placed with the aid of numerous sightline studies and careful equipment selection to ensure that they would not be viewed by a pedestrian from the sidewalk below.

To address the out-of-date electrical system, a new 480 V electrical distribution system with emergency stand-by generator was installed to meet the requirements of a modern museum building. Audio circuits were provided via a segregated distribution system served by an electrostatically shielded isolation transformer to minimize noise. Existing historic luminaires were refurbished for reuse or recreated using energy-efficient sources. New, period-correct energy-efficient luminaires were specified in the historic areas. A central lighting control panel sets scenes throughout exhibit spaces via DMX signals permitting easy reprogramming as exhibits evolve. The system is tied into the fire alarm system for emergency override. Structural reinforcements to the building required selected exterior and interior walls to have shotcrete applied. This, along with the requirement to preserve historically significant areas and the dense mechanical systems, required detailed coordination among the disciplines to place raceway and other systems.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.