System Integration Case Study: 5,000 hp Robotic Birds

Giant dancing birds at a Singapore resort help define the limits of synchronized, large-scale motion control. Mega-scale robotic animatronics system guides two large steel crane structures, each weighing 80 tons and standing 100 ft tall. Four giant hydraulic power units, totaling nearly 5,000 hp, drive an elaborate 10-min. dance.

12/01/2011


The animatronics system for Resorts World Sentosa includes two steel crane structures weighing 80 tons and standing 100 ft tall.In December 2010, Resorts World Sentosa, Singapore’s first integrated resort, opened what it calls the world’s largest dancing animatronics show extravaganza at its waterfront on Sentosa Island. The Crane Dance performance was first conceptualized in 2008 by the four-time Emmy Award-winning Production Designer Jeremy Railton. To help achieve his vision, Resorts World contracted the design, assembly, and commissioning of the cranes’ motion control and protection system to ITMation Limited, a Hong Kong control-system integrator, and subsidiary of Birket Engineering, Orlando, Fla.

Railton imagined two mechanical birds that fall in love with each other; their love eventually transforms them into real birds. The 10-min. nighttime show features a series of breathtaking high-speed motions, with many close and overlapping movements, mimicking the birds’ mating ritual. The resulting mega-scale animatronics system consists of two steel crane structures, each weighing 80 tons and standing 100 ft tall. The structures are powered by four giant hydraulic power units totaling nearly 5,000 hp.

The two steel crane structures are powered by four hydraulic power units totaling nearly 5,000 hp.The slew base of each bird is powered by two hydraulic motors enabling the 80 tons of steel to rotate at more than 15 degrees per sec. The ankle and hip axes are each powered by twin hydraulic cylinders capable of extending or retracting at speeds of over 300mm per sec. Even the giant LED screen on each bird is positioned by a hydraulic cylinder to synchronize its display angle with the bird’s motion. Last but not least is the bird head, powered by two electric induction motors that power the panning and tilting movements.

Making it work

The challenge presented to Eric Tam of ITMation was to create a programmable system that would allow the two birds to act out together the life-like high-speed motions envisioned by the artist, synchronized with music, lighting, video, pyrotechnics, and water effects. The story would be told daily, in a marine environment near the equator, without appreciable risk of a mechanical or hydraulic failure that could damage the massive machines.

To synchronize the 12 motion axes with audio, video, lighting, and water effects, the Simatic central processing unit CPU 317T was selected for the brain of the motion-control system. The Simatic Integrated Safety line CPU 416F was selected for implementing the crane protection system and housekeeping control of the cooling water pumps, hydraulic system, engine control, and other equipment.

The engineers had to create a programmable system that allowed the giant cranes to synchronize their high-speed motions not only with each other, but also with the music, lighting, video, and other effects that made up the show.The CPU 317T can control and synchronize up to 32 motion axes and has built-in functions for optimizing hydraulic servo valve performance. The virtual cam disk function also offers great flexibility in defining and fine-tuning the motion profile of each individual axis. Besides motion-control functions, the CPU 317T is also a powerful programmable logic controller (PLC) that handles all the logic and sequence controls associated with the hydraulic and show control system.

The 10-min. nighttime show at the Resorts World Sentosa features a series of breathtaking high-speed motions, with many close and overlapping movements, mimicking the birds’ mating ritual.During the show, a virtual master axis running in the CPU 317T is synchronized with the time code of the master show control system, which is multi-cast over Ethernet using the user datagram protocol (UDP). The master axis then drives the 12-motion axes through virtual-gear synchronization where speed and direction of each axis is calculated from its respective motion profile represented as cam disks. Using virtual gears and cam disks, all axes of the two birds are able to move like clockwork, producing smoothly choreographed motions.

It’s show time

Even the giant LED screen on each bird is positioned by a hydraulic cylinder to synchronize its display angle with the bird’s motion.To protect the two 80-ton birds from colliding with each other at high speed, even in the event of a system failure, the CPU 416F system’s extremely fast processing speed can evaluate feedback signals from redundant and SIL-rated position sensors on each motion axis. The processor compares the feedback values with the reference values contained in a 15,600-point interpolation model derived from the actual baseline model. The safety limit of each axis is set individually and stored in a safety database.

During the show, the master-axis coordinates are sent from the CPU 317T to the CPU 416F in real time, and deterministically, via high-speed Profinet I/O communication service. Upon receiving the master-axis coordinates, the CPU 416F derives the reference coordinates of each of the 12 motion axes from the interpolation model. The actual feedback values and the reference values are compared. If the deviation of the two sets of values is greater than the limits defined in the safety database, the CPU 416F sends a signal to the CPU 317T to stop all motion axes in a controlled manner. Only after a safety timer has lapsed does the CPU 416F send a signal directly to the final-stage isolators to isolate power from the motion actuators.

“The Crane Dance is going to be an iconic and exuberant masterpiece showcasing the mastery of presenting performing arts through the world’s best technology,” said Ms. Andrea Teo, VP of entertainment at Resort World Sentosa. “Developed over 36 months and taking 800,000 man-hours to create and perfect, our biggest challenge was to have these giant steel cranes achieve the gracefulness of their real counterparts in the wild, and I am confident they will not disappoint.”

The Crane Dance extravaganza opened on Christmas day of 2010 and is a free nightly show located at the waterfront of Resorts World Sentosa.

Eric Tam is cofounder of ITMation Ltd, serving the process industries and the themed entertainment industry. ITMation is also a Certified Solution Partner of Siemens Automation.

Eric Tam of Hong Kong obtained his Bachelor of Engineering and Computing degree from Monash University Australia in 1996 and became a PROFIsafe Certified Designer in 2008. Together with his father he founded ITMation Limited in 2000, serving the process industries. In 2007, ITMation began serving the themed entertainment industry through its relationship with Birket Engineering. ITMation Limited is also a Certified Solution Partner of Siemens Automation.

www.itmation.com 

See more automation case studies at http://www.controleng.com/media-library/case-studies.html

Find system integrators at controleng.com/integrators



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.