Successful use of device diagnostics in asset management

What are the signs of a successful maintenance program?

02/07/2011


Dear Control Engineering: I was reading the article Device Diagnostics and Asset Management. Please explain Storey's final statement in a little more detail.

At the end of the article, Storey is offering a practical way to know if your program is successful. His comment assumes that you are using diagnostics, at least to some extent. His point is that if you sift through the diagnostic data after something has failed, your program is not working as it should. That situation is like a driver who has just hit another car in an intersection going back to see if there was a stop sign that he should have seen.

Storey's indicator of a successful program is when you can show that you avoided a problem thanks to diagnostic information. Here's an example: You have a pump in your plant and your maintenance procedure for that device says that you should replace the bearings every 2,000 hours of operation. That procedure works, but in reality bearings can often last longer than that, but at the same time, if the installer is careless, they may fail after only 1,500 hours. If you have a sensor that can diagnose the bearings' condition, you will know exactly when they are beginning to fail early enough to take appropriate measures. That way you always get the maximum life while avoiding failures under load. You will replace the bearings when they need it, not according to the calendar.

Take the survey that goes with the article and let us know where your company's maintenance program is.

Peter Welander, pwelander(at)cfemedia.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.