Specifying systems for new, existing office buildings

Office buildings might seem like simple structures from the outside, but engineers engaged in such projects know they can be highly complex, with specialized fire/life safety requirements, laboratory spaces, and other unique needs.

10/30/2013


J. Patrick Banse, PE, LEED AP, Senior mechanical engineer, Smith Seckman Reid, Houston. Courtesy: Smith Seckman ReidRobert Ioanna, PE, LEED AP, Vice president, Syska Hennessy Group, New York City. Courtesy: Syska Hennessy GroupDouglas Lacy, PE, LEED AP BD+C, Senior associate, ccrd partners, Dallas. Courtesy: ccrd partners

 

Respondents:

 

J. Patrick Banse, PE, LEED AP, Senior mechanical engineer, Smith Seckman Reid, Houston

Robert Ioanna, PE, LEED AP, Vice president, Syska Hennessy Group, New York City

Douglas Lacy, PE, LEED AP BD+C, Senior associate, ccrd partners, Dallas


CSE: What sorts of challenges do office buildings pose that you don’t encounter on other projects? 

J. Patrick Banse: Many challenges involve the way the space is built out. Designing a shell and core space along with finished-out public spaces from HVAC systems that serve both the proposed tenant space and the finished public space—how does this work, and can it be controlled? Also, providing for the need of 24/7 cooling in elevator controller closets and intermediate distribution frame (IDF) rooms when the building is not yet complete presents challenges.

Robert Ioanna: In office buildings, the building façade characteristics play a very important role in sizing and selecting mechanical, electrical, plumbing (MEP), and fire protection systems. In addition, the height of these buildings often induces a stack effect that can wreak havoc with the ventilation control strategies of buildings. This is particularly true in climates such as the northeast that have both extreme hot and cold seasons. 

Corporate headquarters, such as Pizza Hut’s structure in Plano, Texas, can be highly complex office structures. This structure features test kitchens in addition to conventional office spaces. Photo: ccrd partnersDouglas Lacy: The corporate office projects we specialize in have a project completion schedule that is usually shorter than our other business sectors. With the exception of retail, office projects are by nature one of the fastest-moving project types. They are heavily influenced by the short-term leasing market and influenced by developer ROI. This often requires design of core and shell construction to start well before a final end-user tenant is identified and their project parameters are fully documented. You must be flexible in your design approach and anticipate current and future needs. 

CSE: What type of adaptable or modular office buildings have you helped design recently?

Banse: Modular office buildings generally come complete with single point connections for electrical water and sewer services. These are the easy ones. Others are shell spaces that need interior design along with electrical service size and HVAC requirements for others to build and result in the single point utility connections.

Lacy: The majority of the corporate and medical office projects we work on are developer-driven and can be speculative in nature. Therefore, most buildings must be designed to optimize rentable area ratios and allow for multiple business types to occupy the facilities over their life. The primary focus recently has been in low-rise value offices, such as buildings that have multiple three- or four-story wings in a campus arrangement or attached to a central knuckle or lobby that can have future pods added to the floor plate at a later date. This also influences the types of MEP systems we specify and tends to favor distributed components over centralization. 

CSE: How often are you called on to retrofit or retro-commission an existing building, as opposed to designing a new building? 

Ioanna: A significant portion of our work is being done retrofitting existing buildings. We have seen building owners and developers using the core of these buildings while replacing all MEP systems as well as the building façade. Retro-commissioning is increasing in popularity as building owners look to save energy costs and if located in New York City to comply with Local Law 87

Lacy: We are working on multiple tenant improvement and retrofit projects at any given time along with new construction. Tenant improvements and retrofit projects are a constant and ongoing market segment even in periods of slow growth. Most new office construction projects result from the end user-first exhausting the existing building options in the local market or seeking to build a signature building from the ground up. 

CSE: When designing a new Class A office building, what have building owners been requesting lately? What’s the newest trend? 

Ioanna: The most educated owners are looking to their MEP engineers to become active participants during the initial stages of the project. We have a high-performance building design approach at Syska that begins with the simple geometry/orientation of the building through MEP design construction into operations and maintenance (O&M). Our first mandate is to find ways to reduce HVAC and electrical loads. Second is to use "passive strategies" to cool and power—passive systems such as radiant cooling and natural ventilation. Third, we look to optimize the active systems—the more traditional fans, pumps, chillers, etc. The final step is to figure ways to incorporate renewable energy strategies by implementing solar hot water, photovoltaics, or geothermal where appropriate. 

CSE: Please describe a recent project you’ve worked on—share problems you’ve encountered, how you’ve solved them, and aspects of the project you’re especially proud of.

Banse: We designed the finish out of about 60,000 sq ft of shell space on level 10 of an empty building. The space had the capability to be served by four different air systems with about 35,000 cfm of excess air capacity. The solution was to remove one unit (creating added useable sq ft), use one at full capacity, and use the other two at a partial capacity to keep systems operational and serve 24/7 cooling requirements for IDF rooms and similar spaces. Additionally, the short floor-to-floor height and existing conditions required a return air plenum be used with multiple duct paths through and around walls to structure.

Ioanna: We are increasingly being asked to design retrofit office spaces to increase or maximize the occupancy of the building space. In a specific project for a confidential client, it "dense packed" employees by providing fewer office spaces and reducing the workspace per employee. At the same time the client increased the number of teaming, meeting, and small conference rooms. This created many challenges for the building’s MEP systems. The building’s ventilation systems could not support the outside air and cooling load requirements. We designed separate outside air systems that were integrated to the base building system through controls. We augmented outside air as necessary using CO2 monitoring. We converted the overhead air distribution system to an underfloor air distribution system by connecting the base building supply air ducts to multiple air towers supplemented with additional cooling coils. 

CSE: Describe your experience in designing an office building using the integrated project delivery (IPD) method.

Lacy: The short timeframe associated with office projects has resulted in most projects employing IPD concepts. While most projects still don’t employ integrated form of agreement (IFOA) or multi-party contracts, the teams assembled are often tasked with an understanding that we must function in an IPD manner. With an IPD approach our projects are able to accelerate construction, issue phased packages, and benefit from constructability and cost control during design to avoid “value engineering” and redesign.



RICHARD , NC, United States, 11/19/13 07:48 AM:

Have any of you given thought to UFAD in any of your buildings? studies show IAQ is improved between 30 and 50%.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.