Seven steps to training success

By Jeff Shiver CMRP, Aladon Network RCM2 Practitioner

12/18/2012


When possible, require certification to validate your investment in the skills and knowledge of the craft workers. There are numerous certifications in the condition monitoring approaches (lubrication, vibration, infrared) as well as others.

At this point, you have determined the organization needs, assessed, created individual development plans, created the training schedule, and educated your group. The sixth step is to create metrics or key performance indicators that validate the training return on investment (ROI). With a little thought, you should be able to tie increased performance directly to your training activities effectiveness.

An easy one for starters is seeing an extended mean time between failure (MTBF). Another is measuring rework that occurs within 30 or 60 days following an intervention or PM activity.

Now for the seventh and final step: the continuous improvement feedback loop. You should be constantly assessing the current state. Failures should be moved through a root cause/problem solving analysis process. If training is identified as a possible cause, the training needs along with the skills and knowledge priority matrix should be reviewed and changed as required.

In addition to being driven by failure events, new equipment and methods should be reviewed and integrated into the training process as well. Then, an ongoing process of skills and knowledge assessment followed by education and application of skills must be in place to remain at the top.

With this seven-step process, not only will you have developed a skills and knowledge development approach for your existing craftspeople, but you also have visibility to the skills you should be interviewing for when hiring external candidates. In addition, you also have visibility to the entry-level skills and knowledge requirements necessary for an apprenticeship program. The apprenticeship program can provide a progression path for high-potential operators that are already familiar with your plant and equipment. 

- Jeff Shiver CMRP, Aladon Network RCM2 Practitioner 



Anonymous , 01/12/13 01:53 AM:

My daughter just re-entered to workforce after a hiatus to be a "Stay-at-home mom" She landed a position as HR Director. Her first order of business is to train the rank & file co-workers. I told her about your article in the Dec 2012 issue titled "Training & Development" and e-mailed her a link to it. Excellent article!
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.