Solving the problem

If some means can be found to control scaling, there is potential to save energy, prevent equipment failure, reduce maintenance, and save money.

A range of physical methods can be used to remove fouling deposits. Water jetting, or sand or plastic-bead blasting can be used in accessible locations. However, such methods can be expensive and abrade surfaces.

Magnetic and electronic descaling does not stop precipitation but alters the shape of the crystals to reduce the adherence and buildup of deposits on the pipewall. Perhaps the most remarkable observation is that devices can affect descaling downstream of the point of installation; a softening and loosening of existing scale several weeks after installation is commonly reported.

To understand the mechanism, some knowledge of mineral scale precipitation is necessary. We know that in order to form a scale deposit, three conditions must be met:

  1. The solution must be supersaturated.
  2. Nucleation sites must be available at the pipe surface.
  3. Contact/residence time must be adequate.  

Electronic descaling methods are non-abrasive compared with physical methods. Courtesy: Scalewather North America Inc.To prevent scale it is necessary to remove at least one of these preconditions. Clearly, contact time is not an alterable factor. To be effective, any device must therefore affect either the supersaturation value or the nucleation process.

The direct effect on electronic devices is on the nucleation process and in particular to enhance initial nucleation through the creation of new nucleation sites within the bulk fluid flow. Crystal growth then occurs at these points of nucleation and not at the pipe wall. Suspended solids increase with a corresponding drop in the level of supersaturation, and these effects have been observed in the field. The localized pH increase near the pipewall caused by hydroxyl radicals formed by electromechanical interactions is one mechanism that drives the changed nucleation characteristics.

Electronic devices are not flow-rate dependent and can be built to fit pipe diameter up to at least 60 in. The units are lightweight and easy to install, can be retrofitted, and produce no significant magnetic field. They are usually effective on calcium carbonate, are claimed to reduce iron fouling, and appear to prevent fouling by various other substances. 

Jan de Baat Doelman is president of Scalewather North America Inc.


<< First < Previous 1 2 Next > Last >>

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.