Reliability considerations in simple paralleling applications

04/10/2013


A load shed scheme is required so that when generators are overloaded, the noncritical loads can be taken off line so that there will be sufficient capacity to serve the critical loads. Most paralleling generator set controls have a load shed or load dump output that can be connected to the load shed input of the transfer switches that serve the non-emergency loads (see Figure 2). This will take the non-emergency loads off line in the event that the generator sets are overloaded. Note that to properly shed load, transfer switches must be three position switches with center-off positions. Using two position switches to shed load is not recommended as this often results in connecting the load to a failed utility.

Figure 2. Implementing a load shed function: Connecting the load dump contacts of each generator set in parallel to the ATS load shed input will cause the ATS to shed load in the event that any of the generator sets activate their load dump output. Most gIsochronous vs. droop load sharing. Most load sharing systems today are isochronous, meaning that the voltage and frequency are held constant. However, there are still controls being produced that use droop load sharing, which allows voltage and frequency to vary with load. Droop load sharing controls were once popular because they allowed generator sets to parallel with each other without communicating with each other. Due to the variation of frequency and voltage with a droop paralleling system, the quality of power provided to the load typically is not very good and may not be suitable for some electrical equipment. Isochronous load sharing is the appropriate technology to use. 

Random access paralleling vs. exciter paralleling. Random access paralleling refers to a system in which the first generator at rated speed and voltage closes to the dead bus and then all the other generators actively synchronize and close to the bus. This type of paralleling is the most reliable method and is most commonly used in critical applications. A less expensive paralleling method known as exciter paralleling is used in some paralleling applications. In an exciter paralleling system, all of the generators start with their paralleling breakers closed and their excitation circuits de-energized. When the generators start, they are connected to the bus but produce no voltage. When all generators reach starter disconnect speed, their excitation circuits are energized and the generator bus voltage ramps up with the generators forcing each other into sync. Because exciter paralleling systems will not work until all generators either come up to speed or are locked out, they are not used in critical applications. Another disadvantage of an exciter paralleling system is that if one generator set shuts down it cannot be brought back on line unless the entire system is shut down and restarted. Random access paralleling with active synchronization should always be used when paralleling gensets in critical applications.

Fault tolerance—manual mode. A key consideration in assessing the reliability of a system is its ability to operate when certain components have failed. Having a predefined sequence of operations for a user to follow in a worst-case scenario to manually provide power to loads is often a requirement in critical applications. A user should be able to manually start generators, initiate synchronization, and close paralleling breakers. Manual operation does not mean that the generator control is not operating; it means that functions are user initiated rather than system initiated. All system protection functions will still be active. The control will not allow a paralleling breaker to close if the generator and the paralleling bus are not in phase with each other. 



Anonymous , 05/08/13 10:25 AM:

Excellent Article.
VISH , CA, United States, 05/08/13 12:53 PM:

Some of the increased cost of the parallel system can be off-set by Peak Load shaving technique. Illustration of Pros and cons of the system will greatly help the engineers to make the right decision.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.