SEARCH Archives
Loading
Sponsored by:

PLC programming software now free

AutomationDirect cuts cost of its WinPLC programming software from $695.

Renee Robbins

04/01/2010


 

AutomationDirect-WinPLC-fre.jpg
AutomationDirect has cut the price of Think & Do programming software for its WinPLC processor from $695 to free. Customers can download the Think & Do v8.04 Keyless Development Demo package for PC-based control for free. The free demo is offered as a download only, but it includes the same development software that customers receive when they purchase the full Think & Do development package for $1,895.

Think & Do consists of a development package that runs on a PC, and one or more runtime keys that reside on real-time industrial controller application targets. The free Think & Do demo package has no limits when it comes to development, only in terms of runtime targets. But, these limits don't affect the WinPLC, as it comes pre-loaded with Windows CE and Think & Do runtime software. This means that customers can download the Think & Do v8.04 Keyless Development Demo package for free, create software applications with Think & Do, and download these applications to an unlimited number of WinPLC targets.

For real-time industrial controller targets not pre-loaded with Think & Do runtime software, the development demo package has certain runtime limits. Runtime use is restricted to unlimited sessions up to 30 minutes each for 30 days. These sessions allow ample time for testing and proof of concept, but aren't intended for use in actual real-time industrial control applications. The demo package also doesn't include the software CD, the Quick Start Guide and the USB Runtime hardware key supplied with the $1,895 Think & Do v8.04 Development package.

The software features flow chart programming, an integrated HMI creator (Note: WinPLC does not support integrated HMI, only devices that communicate via serial or Ethernet ports.), advanced data manipulation, and data exchange with business applications such as ERP systems and spreadsheets. Also included are an SQL database interface, and an OPC client and server. System requirements are Microsoft Windows 2000, XP or Vista operating system running on a Pentium IV processor with at least 256MB RAM and 750MB hard disk space. The development system must also include a CD-ROM drive, an Ethernet adapter, a 64MB or higher video adapter and minimum 800x600 monitor resolution.

The WinPLC with Think & Do Runtime is a 100 MHz WinPLC processor module pre-loaded with Windows CE and Think & Do runtime software. The WinPLC plugs into the CPU slot of any DL205 base. It includes 8 Mbyte flash ROM, 8 Mbyte RAM, a built-in Ethernet port and a serial port.

Technical information, pricing and delivery for the complete line of Think and Do and WinPLC products can be found at www.automationdirect.com/pc-control.

- Edited by Renee Robbins, senior editor
Control Engineering News Desk
PLCs, PACs, Programmable Automation Controllers news from Control Engineering



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.