New On-Site Generator/Switchgear

New construction; New On-Site Generator/Switchgear; Stanley Consultants

08/15/2013


This completed building, designed to meet campus historic architecture requirements, was constructed to house the new generator, switchgear, and auxiliary equipment. Courtesy: Stanley ConsultantsEngineering firm: Stanley Consultants
2013 MEP Giants rank:
25
Project:
New On-Site Generator/Switchgear
Address:
Minneapolis, United States
Building type:
Mixed-use (retail and residential)
Project type:
New construction
Engineering services:
Automation & Controls, Code Compliance, Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
February 2011 to June 2013
Engineering services budget:
$8,000
MEP budget:
$129,000

Challenges

Several of the buildings on the campus and the campus as a whole are on the National Register of Historic Places. Installing an outdoor generator, therefore, was not an option. Available site space on the campus as a whole was limited and even more so near the existing generator. Siting options for the building were limited as the campus did not want to lose any available parking. The campus is considered a medical facility, so the service and generator interruptions during construction had to be limited. The tie-in point for the new generator paralleling switchgear was located on the main campus distribution loop. There were several other construction projects on the campus that had to be coordinated with to limit campus outages, including construction of a new residence building.

Solutions

The decision was made to construct a building to house the new generator and switchgear during predesign, and conceptual drawings for the building were approved by the State Historic Preservation Office early in the design process. The building ended up being sited on top of an existing underground utility tunnel, located approximately 3 ft below grade. The utility tunnel was located during design, and the building foundation was designed in such a way as to straddle the utility tunnel and have no adverse effects on the existing utilities. The sequence of commissioning the new generator and switchgear while leaving the existing generator in service had to be considered so that the campus was never without a standby electrical source.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.