Have a plan, and don't hurry at the end, advises Callisto IntegrationAfter a long but successful week on site, it’s hard not to crave that feeling of satisfaction that comes from completely wrapping up a checklist for a system. Every to-do item taken care of, everything documented, everything just done for the weekend. But with that feeling, it’s easy to lose sight of the fact that some to-do items probably shouldn’t be tackled right before you head home. 

As an example of how things could get challenging, Anthony Baker remembers a Friday evening experience where one remaining to-do item was to set up automatic recovery for a device network. Unfortunately, it was slowly discovered that the recovery system wasn’t compatible with a few of the devices on the network. This meant that the troublesome devices would need to be researched; manufacturer’s support lines would need to be called; new tests would have to be planned, etc. 

A story like this is probably something most controls engineers have encountered in their past. It’s a lesson that can be learned the hard way, by getting past a “point-of-no-return” (and spending a long time simply trying to get back to where you started), or more gently by thinking about the “worst case” scenario for each to-do item, and how long it could take to resolve. 

It’s a matter of guessing just how long something could take, based on past experiences and tribal knowledge, and deciding whether that’s time you’re prepared to spend now, or wrap up and tackle the next. It’s not always an easy guess, and the feeling of knowing you can work through any challenges only makes it harder to turn down. Sometimes it just takes a little self-discipline to know that at the end of the day you aren’t at your best anymore, and some challenges just aren’t to be tackled that day. 

It was ultimately found that the devices were incompatible with the recovery system (or any standard recovery system for that matter), and the previous control system was actually custom coded to restore the devices in very individualized ways. Sound like something you’d want to tackle late on a Friday night? Didn’t think so! 

Please consider adding your bit of related advice, a comment, or question, using the feedback tool at the bottom. 

- The Control Engineering “Automation System Integration” blog is written by Anthony Baker, a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration. The blog provides Callisto Integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. See additional posts at www.controleng.com/blogs.

www.callistointegration.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.