Never do this just before leaving a project site

Automation System Integration blog advises not to hurry to check off the last thing on a project list before leaving the site, especially late on a Friday. (When you're in a hurry, if a device can be incompatible, it probably will be.)


Have a plan, and don't hurry at the end, advises Callisto IntegrationAfter a long but successful week on site, it’s hard not to crave that feeling of satisfaction that comes from completely wrapping up a checklist for a system. Every to-do item taken care of, everything documented, everything just done for the weekend. But with that feeling, it’s easy to lose sight of the fact that some to-do items probably shouldn’t be tackled right before you head home. 

As an example of how things could get challenging, Anthony Baker remembers a Friday evening experience where one remaining to-do item was to set up automatic recovery for a device network. Unfortunately, it was slowly discovered that the recovery system wasn’t compatible with a few of the devices on the network. This meant that the troublesome devices would need to be researched; manufacturer’s support lines would need to be called; new tests would have to be planned, etc. 

A story like this is probably something most controls engineers have encountered in their past. It’s a lesson that can be learned the hard way, by getting past a “point-of-no-return” (and spending a long time simply trying to get back to where you started), or more gently by thinking about the “worst case” scenario for each to-do item, and how long it could take to resolve. 

It’s a matter of guessing just how long something could take, based on past experiences and tribal knowledge, and deciding whether that’s time you’re prepared to spend now, or wrap up and tackle the next. It’s not always an easy guess, and the feeling of knowing you can work through any challenges only makes it harder to turn down. Sometimes it just takes a little self-discipline to know that at the end of the day you aren’t at your best anymore, and some challenges just aren’t to be tackled that day. 

It was ultimately found that the devices were incompatible with the recovery system (or any standard recovery system for that matter), and the previous control system was actually custom coded to restore the devices in very individualized ways. Sound like something you’d want to tackle late on a Friday night? Didn’t think so! 

Please consider adding your bit of related advice, a comment, or question, using the feedback tool at the bottom. 

- The Control Engineering “Automation System Integration” blog is written by Anthony Baker, a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration. The blog provides Callisto Integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. See additional posts at

Callisto Integration is a CSIA member as of 3/1/2015

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
A cool solution: Collaboration, chemistry leads to foundry coat product development; See the 2015 Product of the Year Finalists
Raising the standard: What's new with NFPA 70E; A global view of manufacturing; Maintenance data; Fit bearings properly
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Upgrading secondary control systems; Keeping enclosures conditioned; Diagnostics increase equipment uptime; Mechatronics simplifies machine design
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.