Manufacturer focus: Designing labs, research buildings

05/28/2013


CSE: What unique fire, life safety, or security issues have you tackled? Describe the project.

Schneider Electric: The biggest challenges have been integrating security as well as fire and life safety in our current Biosafety Level 4 projects. The amount of redundancy and reliability built-in is 10 times more complex than a BSL-3 or BSL-2 project.

CSE: Describe a recent college or university teaching lab project. What were the challenges and solutions?

Schneider Electric: The biggest challenges have been integrating security as well as fire and life safety in our current Biosafety Level 4 projects. The amount of redundancy and reliability built-in is ten times more complex than a BSL-3 or BSL-2 project.

CSE: What building envelope challenges have you tackled in a recent lab or research facility? Define the problem and solution.

Schneider Electric: The biggest challenges in every area are on our BSL-4 lab buildings. Leakage and building envelope issues go hand in hand. As building automation providers, we must work closely with technically versed architects, engineers and commissioning agents work to execute these immensely complex projects.

CSE: When working in labs, what types of projects have been driven by new requirements in ASHRAE Standard 62.1, Ventilation for Acceptable Indoor Air Quality? What challenging projects have you worked on?

Daikin McQuay: Standard 62.1 has considerable influence on lab projects due to the increased need for energy efficiency and the design challenges of ventilation in lab design. Any lab project with Class 2, 3, or 4 air streams will need to carefully review the requirements of 62.1 for the potential of heat recovery.

CSE: Describe a unique fume hood project—describe the goals, challenges, and your product’s success. 

Schneider Electric: We are currently studying a pharmaceutical building with fume hoods for an energy upgrade. The project team is considering fume hood interior retrofits. In an ideal installation, the aerodynamics of each fume hood is improved such that safety is improved even as the energy use is reduced. The usual goal is to drop the minimum inflow velocity from 100 fpm to 60 fpm.

CSE: When working in facilities that have BSL-3 and BSL-4 containment, what unique systems or products do you provide? Describe a recent BSL facility. 

Schneider Electric: We are currently in design and construction on multiple BSL-4 facilities in the U.S. and overseas. Like race cars help companies design the family car, designing BSL-4 labs help us in designing BSL-3 and BSL-2 labs. One of the results of doing such complex buildings as BSL-4 is Schneider Electric's TVDA approach. Ten years ago, many third-party systems like fire and life safety where integrated in the field for each building. The current approach of TVDA is to test, validate, and document each architecture in the test lab prior to installation in the field. This has led to quicker installation with higher quality and lower cost. This especially applies to integrating systems from third party providers into an overall building automation framework.


<< First < Previous 1 2 3 Next > Last >>

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.