Managing and monitoring plant power

The Sao Salvador Poultry Processing Plant, better known as SuperFrango (SuperChicken), is a pioneer in modern poultry-raising systems in Brazil’s central region.

10/01/2010


The Sao Salvador Poultry Processing Plant, better known as SuperFrango (SuperChicken), is a pioneer in modern poultry-raising systems in Brazil’s central region. Headquartered in Itaberai, Brazil, the plant was founded in 1970 through a partnership between friends Carlos Vieira da Cunha and Jose Carlos de Souza. SuperFrango routinely invests in new technology to improve operational stability, which was demonstrated during the recent Pintos de Corte incubator.

After 5 years of planning, design, and construction, along with a $12.6 million investment, SuperFrango opened its new slightly larger than 150,000-sq-ft facility on more than 1 million sq-ft of space. The plant provides jobs for roughly 1,400 people, processes more than 180,000 chickens daily, and produces more than 10.7 million eggs monthly. As with most industrial facilities, SuperFrango needs reliable, economical power. Utility power at the site is provided based on “time-of-day” rates, so economics dictated a design that provides a seamless transfer between utility and generator plant. A prime power generation and ramping power transfer system was the solution SuperFrango sought. SuperFrango partnered with Cummins Power Generation, and the installation began in April 2006 with a delivery made in November 2008.

The system Cummins provided included five Cummins model C400D6 456 kWA diesel generator sets driven by Cummins NTA855G5 engines. The generator sets also include alternators and PowerCommand digital paralleling controls and switchgear manufactured by Cummins. The Cummins peak power system helps SuperFrango meet its electricity needs by monitoring utility power, starting and paralleling generators when and if power fails, and transferring from the utility to generators as needed. Depending on the time of day, the system will automatically start the generators, parallel them to the utility, and control their power output to minimize load and utility costs.

The generators provided can operate the entire facility. When the time comes to shut the generators down, the system synchronizes and parallels the generators to the utility, transfers the load back to the utility, disconnects and cools the generators, and leaves them ready to start again. By operating the standby power system in prime power mode at peak hours, SuperFrango achieves savings of 30% during the 3 hours of the day when utility power costs are the highest.

Information provided by Cummins Power Generation



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.