Machine Safety: Verification is not validation

Know the 5 steps of the functional safety lifecycle. To perform functional safety and comply with safety standards like ISO 13849-1 and ISO 13849-2, design engineers need to know how to perform verification and validation measures; they are not the same step.

05/20/2014


To perform functional safety and comply with safety standards like ISO 13849-1 and 2, design engineers need to know how to perform verification and validation measures. But aren’t they the same step?

In the functional safety lifecycle, 1) Perform risk assessment, 2) Examine functional requirements, 3) Design and verify mitigation, 4) Install and validate, and 5) Manage, change, and improve. Courtesy: Control Engineering Machine Safety Blog, JB Titus & Associates

The most immediate answer is NO!

Best-in-class companies are generally adopting the “lifecycle” design model when approaching functional safety design requirements. An example is shown in this graphic of the functional safety lifecycle:

1) Perform risk assessment

2) Examine functional requirements

3) Design and verify mitigation

4) Install and validate

5) Manage, change, and improve.

ISO 13849-1 requires that during the design stage a verification step is performed (lifecycle step #3). For example, see clause 4.7 on page 26 of the standard [talking about Safety Related Parts of The Control System (SRP/CS)]:

4.7 Verification that achieved PL meets PLr

“For each individual safety function the PL of the related SRP/CS shall match the required performance level (PLr).... The PL of the different SRP/CS which are part of a safety function shall be greater than or equal to the required performance level (PLr) of this safety function.”

Validation is a different step. While verification is often performed by someone other than the original designer during the design phase, validation is performed during the build and/or installation stage (lifecycle step #4). The goal of validation is to acknowledge that the required safety function is actually achieved for any one hazard in all modes of operation. For example, see clause 8 on page 41 of the standard:

8 Validation

“The design of the SRP/CS shall be validated (see Figure 3). The validation shall demonstrate that the combination of SRP/CS providing each safety function meets all relevant requirements of this part of ISO 13849. For details of validation, see ISO 13849-2.”

The above requirements are for the safety related parts of the control system (SRP/CS) for a machine’s overall control system. Additionally, ISO 13849-1 and 2 also cover the software of a control system, which also includes requirements for verification and validation of application software for all safety functions.

It is my opinion that this information could help clear up possible confusion over the terms "verification" versus "validation" for functional safety applications. If you have additional understandings or clarifications please submit your ideas, experiences, and challenges in the comments section below.

Related articles linked in the text and the bottom of this post, follow:

The Safety Standards Maze, 3 Comments: More Standards, Validation

Machine Safety: safety system validation and daisy divination

Verification and validation by Lenze 

Contact: www.jbtitus.com for “Solutions for Machine Safety”.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.