Machine Safety: Are you a chosen one?

A joint committee is merging two global machine safety standards (ISO 13849-1:2006, Safety of machinery -- Safety-related parts of control systems -- Part 1: General principles for design and IEC 62061:2005, Safety of machinery - Functional safety of safety-related electrical, electronic and programmable electronic control systems). Is this a good thing?

11/02/2012


We live in a business world that’s both global and local. The world’s compliance requirements are also very complex and varied from rigid requirements to shut your eyes! Two global standards (ISO 13849-1:2006, Safety of machinery -- Safety-related parts of control systems -- Part 1: General principles for design and IEC 62061:2005, Safety of machinery - Functional safety of safety-related electrical, electronic and programmable electronic control systems) have formed a joint committee to merge these standards. Is this hurray?

 

For the most part, yes!

 

There have been a few blogs and white papers (including yours truly) on this subject. And, there’s a new blogger that’s recently expressed an opinion. Rockwell Automation’s updated Safety Resource Center web site is now available and it includes a new safety blog called “Guardman Blog.” The first blog is titled, “What direction are standards going? 13849/62061.” Interesting and on topic, yes? Actually, the writer presents a pretty good summary of why combining these two standards will benefit industry (global and local) but for those who are chosen. This means that interested parties will be from the more complex countries with rigid requirements.

 

And, like all similar commentary (and, all the safety standards as well) the attention is driven to the SRP/CS. SRP/CS decoded means – Safety Related Parts of the Control System. As an end user in the United States, what’s this mean? Well, since you’re the first in line for OSHA enforcement, these standards deal with only a piece of your challenge. For review, your challenge is to address the full curve of hazard reduction from mechanical redesign to gloves and steel toe shoes. SRP/CS is getting a lot of attention, that’s correct, but for you, it’s only part of the full curve.

 

Are you getting enough attention to the full curve?

 

J.B. Titus, CFSEYour comments or suggestion are always welcome so please let us know your thoughts. Submit your ideas, experiences, and challenges on this subject in the comments section below. Click on the following text if you don't see a comments box, then scroll down: Machine Safety: Are you a chosen one?

 

Related articles:

Machine Safety – globalization of safety standards doesn’t equal global compliance.

Inside Machines: Does adopting ISO 13849-1:2006 change the U.S. model for compliance and enforcement?

Machine Safety – does OSHA reference consensus standards for compliance?

Machine Safety: Is OSHA okay with my 'acceptable' risk mitigation?

Contact: http://www.jbtitus.com for “Solutions for Machine Safety”. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.