James B. Hunt Jr. Library

New construction; James B. Hunt Jr. Library; Affiliated Engineers Inc.

08/15/2013


The bookBot robotic book delivery system. Courtesy: Mark Herboth Photography LLCEngineering firm: Affiliated Engineers Inc.
2013 MEP Giants rank:
9
Project:
James B. Hunt Jr. Library
Address:
Raleigh, N.C., United States
Building type:
School (college, university)
Project type:
New construction
Engineering services:
Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
September 2008 to January 2013 
Engineering services budget:
$17.6 million
MEP budget: $17.6 million

Challenges

The A/E team for the 253,000-sq-ft James B. Hunt Jr. Library was tasked with Building Exterior (North & West Façades). Courtesy: Mark Herboth Photography LLCdesigning an iconic facility that would serve as a signature structure for North Carolina State University's Centennial Campus. The building had to be flexible and modern to meet the 21st century's new learning paradigms. At the same time, the building was required to meet the state's stringent new energy efficiency law requiring it to exceed the ASHRAE 90.1-2004 requirements by at least 30%. As part of the facility's design, the owner and architects wanted to connect the building to the environment by providing extensive glass on all façades. AEI was challenged to allow these striking views while minimizing the load to the HVAC system. AEI also faced the challenge of designing MEP systems that support one of the most technologically sophisticated learning spaces in the world, including a bookBot robotic book delivery system and five giant high-definition display walls. The library's Teaching & Visualization Lab and Creativity Lab include large projectors and Dual Heat Recovery Dedicated Outside Air Unit (DOAS). Courtesy: Jerry Blow Architectural Photographyservers with high power requirements, producing a tremendous amount of heat load. The final challenge was a total project budget reduction of $10.7 million during the design development phase.

Solutions

To provide sustainable design solutions within the library, AEI integrated the MEP design with the following systems:

  • Dedicated Outside Air System (DOAS) with active chilled beams and both cooling and heating radiant panels.
  • A dedicated air handler for the auditorium, allowing a separate operation and shut down schedule. Demand control ventilation strategies reduce outside airflow.
  • Hydronic Systems. Courtesy: Jerry Blow Architectural PhotographyLighting controls based on occupancy and daylighting.
  • Solar domestic hot water.
  • Reduced potable water using low-flow restroom fixtures.
  • Zone level airflow reduction based on occupancy.
  • Centralized air monitoring system

To address the load issues presented by the glass façade, AEI worked with the architects to extensively model the building using daylighting analysis and TRACE energy simulation. The final design includes a combination of vertical and horizontal external shading and fritted glass. AEI's lighting group, Pivotal, designed and implemented the daylight-centered architectural lighting strategies. AEI met with NC State's maintenance staff throughout the project to assure their understanding and Quiet Reading Room. Courtesy: Mark Herboth Photography LLCapproval of these new systems, especially the active chilled beams and radiant panels. This included site visits to other higher education institutions that had already adopted these technologies, as well as a manufacturer's test facility. AEI also provided CFD Modeling of congregation spaces to demonstrate the quick recovery times of the chilled radiant ceiling system to bring the room back to setpoint when going from unoccupied to occupied. AEI's MEP systems resulted in total energy savings of 31% over ASHRAE 90.1-2004 requirements.

The project was completed on-time and under budget despite these challenges. The project has been awarded LEED Silver certification. Upon completion, Susan K. Nutter, Vice Provost and Director of NCSU Libraries, said, "I am awestruck by your work...and the students are over the moon. We worked so hard on the building and to see that you did also fills me with joy. I am forever grateful."

Sky Lounge at Dusk. Courtesy: Mark Herboth Photography LLCYellow Illuminated Stairs. Courtesy: Mark Herboth Photography LLCVertical Fins on East Façade. Courtesy: Mark Herboth Photography LLC



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.