Ignition: How to connect to KepServerEx 5.2 via OPC-UA
Human-machine interface, SCADA, and manufacturing execution system connections to OPC-UA are easier with Ingition software, says Inductive Automation.
Previous connections from Inductive Automation Ignition HMI-SCADA-MES software to KepServerEx has been through an OPC-DA connection. These connections use what Inductive Automation calls “the famously difficult and unsecure Microsoft DCOM technology.”
Ignition version 5.2 software can connect to KepServerEx directly via OPC-UA. OPC-UA, says Inductive Automation, offers greater security and ability to easily set up remote connections.
Inductive Automation offers a step-by-step guide, with screen captures, for connecting Ignition to KepServerEx v5.2. The first step covers configuring Ignition, then KepwareServerEx 5.2, the Inductive Automation said in a June 10 announcement. http://www.inductiveautomation.com/news/item/255/62010
Making connections
In May, Inductive Automation cited system integrator Kyle Chase, had recently performed a system upgrade to Ignition from Inductive Automation’s legacy products, FactorySQL and FactoryPMI.
“I just finished transitioning a smaller facility last week to Ignition,” said Chase, systems integration specialist for Surefire SCADA Inc. “There were a few changes I had to make to historical trending and historical SQL tags, but other than that, everything just dropped into place. It worked really well.” Among other new features is a free OPC Unified Architecture (UA) server, Inductive Automation says.
Also read: Upgraded HMI/SCADA software powered by OPC-UA.
Learn more about Ignition software capabilities at upcoming OPC roadshows or on the company’s web site.
-Edited by Mark T. Hoske, Control Engineering, www.controleng.com
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












