How to specify an arc flash relay


How an arc flash relay works

Fig. 2: An arc flash relay uses light sensors and current sensors to detect the beginning of an arc flash, and then sends a signal to an upstream circuit breaker to shut of the power. Courtesy: LittelfuseAn arc flash relay (Figure 2) uses light sensors to detect the beginning of an arc flash and then sends a signal to an upstream device (typically a circuit breaker) to shut off the power in less than 1 ms. The benefit is in the disparity between typical overcurrent devices that can take up to two cycles (32 ms) to detect a fault and send a trip signal to the upstream device, and the arc flash relay that reacts in fractions of that time, thus lowering the incident energy. The disparity is even greater for some circuit breakers that have longer clearing times of more than 8 cycles/100 ms.

Where to install arc flash relays

In commercial buildings, arc flash relays are typically mounted inside the 480 V, 3-phase switchgear in the maintenance room. They are generally not specified for other panels because the power at those panels is typically below 300 V. 

In an industrial facility, arc flash relays are installed both in the main switchgear and in smaller switchgear distributed across the plant, as well as in motor control centers (MCCs) and other electrical panels, assuming voltage is above 300V. 

The arc flash relay should not be connected to the breakers on the branch circuits coming from the bus bar, but rather to a breaker upstream. If an arc flash occurs on the bus bar, then tripping downstream breakers won’t help.

Arc flash relays and power analysis software

Power system analysis software packages like SKM, ETAP, and EasyPower are starting to include arc flash relays in their component libraries. This allows users to perform what-if analysis for a variety of relay configurations, circuit variables, and fault conditions, although there are limitations: Current power system analysis software can model the overcurrent setting of an arc flash relay but not the light detection, which can lead users to increase the pickup value or time delay to avoid nuisance tripping; this could lead to arcing faults going unnoticed until it is too late. With some arc flash relays this is not an issue as the light is used to prevent nuisance tripping on electrical noise or momentary overload conditions while still allowing for very fast tripping, and in most cases there are work-arounds for the limitations of the software.

Arc flash relays and zone identification

Fig. 3: Generally, it is recommended to mount 1 or 2 sensors per cubicle to cover all horizontal and vertical bus bars, breaker compartments, drawers, and anywhere that there is potential for an arc fault. Threading a fiber-optic sensor through the cabineIn zone-selective interlocking, an electrical system is divided into zones, with each zone extending from the output of the breaker at its input to the input of the next breaker downstream. An overcurrent protective device that detects an overcurrent or ground fault in its own zone will trip instantly while simultaneously signaling the breaker upstream to go into delay mode. This maintains selective coordination and at the same time minimizes fault duration and the damage it causes. The arc flash relay can also be linked in a similar manner to provide backup protection. For example, an arc flash event in a MCC will cause the arc flash relay to send a trip command to the main circuit breaker in the MCC. If that breaker does not trip, the arc flash relay will send a signal to the linked arc flash relay upstream to trip the upstream feeder circuit breaker. Because an arc flash relay accepts multiple light sensor inputs, separate sensors can be installed in each cubicle, compartment, or bucket. Protection zones can be implemented by connecting several arc flash relays to the same breaker. If individual circuit protection is desired, it’s possible to install separate arc flash relays in each cubicle and connect them to the associated feeder circuit breaker.

Zone protection generally is not used in a commercial building application because safety is paramount, and if there is an arc fault then the entire switchgear cabinet should be de-energized.

How long a delay

Many arc flash relays have programmable time delays on their light sensor inputs whose purpose is to reduce nuisance tripping from such causes as flash photography. Typically, a programmable time delay filter can be set between zero (instantaneous light detection) and one or two seconds for special application conditions. As a general rule, the programmable delay should be set to the minimum value consistent with nuisance tripping avoidance 

Arc flash relays with current inputs can be set up to trip on either light input alone, light input inhibited by current input (no trip on light unless there is sufficient current), and on overcurrent. The overcurrent trip delay can be used for selective coordination. Coordination for arc flash protection is not practical due to the fast reaction time required and utilizing light as a fault detection method.

RAJ , TX, United States, 04/05/13 06:27 PM:

A good article on the ARC Flash in non technical language for all to understand. The GIGO applies to all the software (Garbage in, garbage out), however experience over only ability to calculate always prevails. No engineer should give into pressures of budgets and should think of safety of people operating it 5 or ten years after start up is essential for plants using high currents at 208 Volts or higher.
HORMAZ , IL, United States, 04/20/13 04:04 PM:

Small services do not have
relay operated circuit breakers, so how do you plan
to trip this breaker other than its normal function?
At what point does this type
of protection become mandatoty?
Anonymous , 05/06/13 12:47 PM:

I am amazed that there are so many way that we can reduce arc flash today.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
2015 Mid-Year Report: Manufacturing's newest tool: In a digital age, digits will play a key role in the plant of the future; Ethernet certification; Mitigate harmonics; World class maintenance
2015 Lubrication Guide: Green and gold in lubrication: Environmentally friendly fluids and sealing systems offer a new perspective
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Cyber security attack: The threat is real; Hacking O&G control systems: Understanding the cyber risk; The active cyber defense cycle
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths
New industrial buildings: Greener, cleaner, leaner; New building designs for industry; Take a new look at absorption cooling; Offshored jobs start to come back

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.