Hillshire Brands Headquarters

Existing building retrofit; Hillshire Brands Headquarters; Environmental Systems Design Inc.

08/15/2013


The Hillshire Brands’ 400 South Jefferson headquarters building is shown after renovations, which included new windows and a new roof. Courtesy: Environmental Systems DesignEngineering firm: Environmental Systems Design Inc.
2013 MEP Giants rank:
28
Project:
Hillshire Brands Headquarters
Address:
Chicago, United States
Building type:
Office
Project type:
Existing building retrofit
Engineering services:
Electrical/Power, Fire & Life Safety, HVAC
Project timeline:
January 2012 to December 2012
Engineering services budget:
$440,000
MEP budget: $440,000

Challenges

For the relocation of its headquarters office from the suburbs to the city of Chicago, Hillshire Brands was interested in the 300,000-sq-ft building at 400 South Jefferson. The building's owner, Sterling Bay, offered to finance a comprehensive repurposing of the existing industrial building, including a new roof, removal of walls, and new windows. The interiors of the build-out consisted of general office space and specialty areas such as test kitchens and conference space. However, the tight timeline was a challenge for the design team. The renovation schedule, from the start of design to Hillshire's move-in, was set for one year and required a fast-track design approach from all team members. ESD's MEP design team had 6 weeks to complete bid and permit documents, compared to the 8- to 10-week design schedule for a normal project of this scope and magnitude.

Solutions

To meet the aggressive schedule, the entirety of the project was modeled using BIM software. ESD used Revit MEP for the mechanical, electrical, and plumbing systems. The as-built building conditions had already been modeled in BIM software by the base building contractor, and both the interiors architect and lighting designer were using Revit Architecture. This gave the ESD design team the ability to coordinate with all trades and speed up the design process. The result was a complete, quality set of drawings within the tight timeframe. A comparison between photos of the constructed space and the construction documents produced in BIM demonstrates the accuracy produced by this comprehensive coordination and the overall success of the design team.

 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.