Glossary of 'Lean’ manufacturing

Back to Basics: As lean thinking and practices continue, the definitions risk being corrupted, adapted, or mutated to nicely conform to businesses objectives. For apples-to-apples measurement, be “non-negotiable” on the following meanings, consistent with Toyota Production System definitions.

05/01/2007


 

As lean thinking and practices continue, the definitions risk being corrupted, adapted, or mutated to nicely conform to businesses objectives. For apples-to-apples measurement, be “non-negotiable” on the following meanings, consistent with Toyota Production System definitions.

 

Set-up (changeover): The total time required to change from the last good piece with old tooling to the first good piece with new tooling. This definition includes preparation (getting ready to make the change) replacement (remove and replace the tooling), positioning , (locate the tooling in the correct location in the equipment), and adjustment (first-piece inspection, machine tweaking, trial runs). Typical set-up time reduction of 50-75% is achievable on a low-cost, no-cost basis.

 

Kaizen : Continuous, incremental improvement of an activity to create more value with less waste. Kaizen blitz refers to a team approach to quickly tear down and rebuild a process layout to function more efficiently.

 

Kaikaku : Radical improvement of an activity to eliminate waste (also called breakthrough Kaizen ); typically a 2-5 day event.

 

Kanban : A signaling device that gives instruction for production or conveyance of items in a pull system. Examples of a Kanban are a space on the floor, a container, a card, an empty shelf, an andon light, or electronic signal.

 

Poka-yoke : A mistake-proofing device, method, or procedure to prevent a defect from occurring during the process. Poka-yoke devices are specifically designed to eliminate mistakes before they become a defect. Focus is on prevention and detection before the error proceeds downstream and turns into a defect.

 

Waste (muda): Anything that does not add value to the product is waste and must be reduced or eliminated. Eight types are overproduction, waiting, moving, process inefficiencies, inventory, unnecessary motions, defective products, and unused creativity.

 

Value add (VA): Activities that transform or shape products or services that are sold to customers, such as assembly, painting, machining, forming, welding, and heat treating.

 

Non value add (NVA): Activities that take time, resources or space, but do not transform, or add to the customer’s desired or perceived value of a product. Waste is NVA, also inspection, test, rework, and quality audit. Many businesses will argue that these activities are VA, since they are either required by the customer or are a necessary evil. But why does the customer require inspection and test? If processes were robust (without errors), would these actions be required? Reduction or elimination of this NVA activity would reduce cost and cycle time and favorably impact customer satisfaction.

 

Standard work : A precise description of each work activity specifying cycle time, takt time (maximum time to produce a product to meet demand), work sequence of specific tasks, and the minimum inventory of parts on hand needed to conduct the activity. Standard work is NOT the same as work standards (rate per hour at a specific task).

 

Bottleneck (BN): A resource whose capacity is less than or equal to the market demand. (It is occupied 24 x 7, 365 days per year.)

 

Non-bottleneck (NBN): A a resource whose capacity is greater than the market demand. (It is available 24 x 7, but not always occupied).

 

Capacity-constrained resource (CCR): A resource between a BN and an NBN. The resource has periods of over-capacity (erratic demand, breakdowns, lack of material).

 

Gemba (genchi genbutsu): Going to the place (where the problem exists) to see the actual situation for understanding. The first step in problem solving is to clearly and deeply understand the situation through personal observation, data gathering, and analysis. The guiding principle is to take nothing for granted and know what you are talking about, and that is achieved through gaining first-hand knowledge of the problem or issue to be corrected.

 

As you take the lean journey, acquire a standard glossary of lean terms so everyone can speak the same improvement language.

 

 

Author Information

Bob Yenkner is principal with Practical Process Improvement. Reach him at ryenkner3@comcast.net.

 

 

www.practicalprocessimprovementct.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.