Operational reliability is critical to the effectiveness of any water treatment facility. If automation systems and the processes they control are not dependable, the plant faces the risk of non-compliance with local, state or federal water quality guidelines.

At the Marcellus water treatment plant in upstate NY, The Onondaga County Water Authority (OCWA) undertook an ambitious project to update its processes and technology to meet new and proposed state health department and EPA regulations. This effort involved expansion of the facility from four to six filter beds, as well as the modernization of various mechanical systems and chemical processes. The plant also upgraded its overall control and instrumentation system in order to enhance automation performance, improve reliability, provide for simple and cost-effective expansion, and reduce operating and maintenance costs.

The Onondaga County Water Authority (OCWA) supplies water from Otisco Lake and Lake Ontario to more than 345,000 retail and wholesale customers via 91,000 metered connections throughout suburban Onondaga County and parts of Madison, Oneida, and Oswego counties.

A treatment plant owned and operated by OCWA, which treats water from Otisco Lake, supplies approximately half of the utility’s water. Located in Marcellus, the facility has undergone infrastructure improvements designed to enhance its overall performance. OCWA recently rehabilitated four existing filter units and added two new filters to improve the plant’s water quality, increase its reliability, and comply with state and federal regulations governing municipal drinking water plants.

Process description

OCWA has two intake pipes located in Otisco Lake. The water entering these pipes is immediately chlorinated to provide disinfection and discourage growth of zebra mussels. The water then travels, by gravity, approximately five miles to OCWA’s water treatment plant in Marcellus. (See Fig. 1.)

OCWA’s water treatment plant in the town of Marcellus, NY, has undergone infrastructure improvements designed to enhance its overall performance.Water first enters the rapid mix tank where a coagulant (polyaluminum chloride) and a taste and odor control chemical (powdered activated carbon) are added. After 30 seconds of mixing, the water enters the contact basins where calm conditions allow the coagulant to make small particles adhere together to form larger particles. Some of these particles settle and are cleaned out later. The contact time in the basins also allows the powdered activated carbon (used during times of high algae growth in the lake) to absorb organic taste and odor causing chemicals.

After approximately one hour of contact time, the water enters one of the six filters. Particles are removed as the water passes through beds of granular activated carbon and sand. The filters are washed periodically and the water used to do this is collected in lagoons and allowed to settle. It is then recycled back to the start of the treatment plant to be treated again.

After filtration, the water is once more disinfected with chlorine and fluoride is added. The water is stored in large tanks located at the treatment plant to provide adequate contact time for the chlorine to work. Once water leaves the tanks, orthophosphate is added to provide a coating for pipes in the distribution system to prevent leaching of lead and copper from the pipes.

Operational challenges

As part of the control system modernization, OCWA decided to upgrade its legacy Bristol-Babcock 3335 remote terminal units (RTUs) with Emerson’s ControlWave programmable automation controllers (PACs). Plant management sought to improve the performance of control room operators by transitioning from manual analog control to a fully automated SCADA system utilizing Ethernet and Modbus network communications. (See Fig. 3.)

The original analog control system at Otisco Lake Water Treatment PlantIn addition, OCWA wanted to reduce wiring and instrument maintenance costs at its water treatment facility. This would require eliminating multiple long cable runs between sensors, actuators, and controls, plus a solution for collecting multiple sensor/control pairs near their point of installation. Such an approach would do away with hundreds of previously installed twisted pairs, cable trays, complex wiring diagrams, and associated maintenance.

New technology

In October 2008, the Marcellus facility began the task of replacing outdated analog control equipment with the latest technology, and moving all process automation functions to an online SCADA system. The project called for replacing existing RTUs to provide a scalable platform suitable for a variety of small applications, as well as control strategies spanning the entire plant while gaining the ability to leverage modern digital signal transmission. (See Fig. 4.)

functions are now controlled through a PC/PLC-based control system.Key to the control system upgrade was implementation of distributed and remote I/O — specifically a solution employing isolated I/O modules to eliminate signal loop interference on the Ethernet control network. This would stop ground loops and signal aberrations at any location from affecting other measurements in the facility. Digital communications, in place of analog signals, also eliminates sensor and control signal degradation (and associated calibrations) and cross communication (noise) commonly associated with analog-only communications.

Various automation equipment suppliers now offer modular I/O systems that can be used as a relatively low-cost method of bringing field devices from the plant floor into a SCADA or control system using Ethernet. These systems can communicate with each other and other computers over standard Ethernet using off-the-shelf hubs, switches, and routers, and can be viewed from a wireless laptop, web browser, spreadsheet, or third-party HMI. (See Fig. 5.)

As part of the improvements, automated valves were installed and connected to the instrumentation network.After considering alternative vendor offerings, OCWA’s project team decided upon the NET Concentrator System (NCS) from Moore Industries. This smart I/O system takes advantage of cable-concentrating technology, which eliminates point-to-point cable, conduit, and wire trays by sending process monitoring and control signals between the field and control room on a single digital communication link. The system provides true signal isolation, with isolated modules for both analog and digital I/O. All discrete and analog signals are digitized, packetized, and carried via Ethernet using standard cables, LAN switches, and routine Ethernet hardware. (See Fig. 6.)

Moore Industries’ NET Concentrator System (NCS) provides a solution for distributed and remote I/O.The distributed and remote I/O system functions as a universal signal gateway that interfaces with OPC-compatible DCSs or PLCs, and works over 10/100Base-T Ethernet (Modbus/TCP) and Modbus RTU networks. The system includes a communications module plus multiple I/O modules. Each I/O module supports multiple analog or discrete channels that interface to remote sensors, switches, actuators and displays. Each analog input channel incorporates its own 20-bit A/D input. This guarantees that no resolution from the existing analog transmitters will be lost when the signal is transmitted via Ethernet to the host system.

At the Marcellus water treatment plant, the distributed and remote I/O communication module digitally communicates signals to a network concentrator in a peer-to-host network. The use of digital communication with error correction and high-speed Ethernet LAN cable assures signal integrity and minimizes signal degradation that could otherwise exist with traditional home-run analog signals.

Control architecture

For OCWA’s engineering and operations personnel, the peer-to-host distributed I/O system provides a reliable method of transferring monitoring and control signals to and from the PLC-based control system. In this configuration, five remote I/O stations are situated along the Ethernet network in different areas of the plant. Each station contains 10 to 15 I/O modules. For monitoring applications, the system collects signals from analog transmitters or discrete devices. It concentrates the signals and, when polled by the network master, sends them over the Ethernet network directly to the main PLC control panel. For control, process commands from the host are transmitted over the network and converted to analog or discrete form to control valves, pumps, motors, and other types of proportional and on/off control elements.

Once field device data is delivered to the computer-based host, SCADA software provides a user interface supporting data acquisition, alarm management, data logging and reporting, historical data collection and trending, and supervisory control functions. (See Fig. 7.)

In a peer-to-host system, multiple field concentrators network to handle signal inputs and outputs.A field concentrator makes it easy to connect both existing and new process control signals and sensors to the control strategy. Such an approach expands control schemes by concentrating I/O remotely—and significantly reduces wiring costs. The use of analog input modules with a built-in 24 V power supply per input eliminates the need to run wiring from the modules to another terminal or auxiliary 24 V power supply, thus helping to make remote control panels smaller.

With the distributed and remote I/O system, operators can now view I/O within the plant directly from a local HMI or wireless laptop. This allows the operator to monitor and make adjustments to the facility operations from anywhere in the plant. The I/O signals remain fully accessible, even in the event of a main control system failure. In addition, technician trips into the field are less frequent to troubleshoot flowmeters, pressure transmitters, valves and other devices.

Project results

The new PLC, SCADA, and distributed and remote I/O systems at the Marcellus plant have extended process automation and enabled operators to manage potential problems safely and swiftly. They have also helped to reduce hard-wiring costs and maintenance requirements. Most importantly, the new equipment has proven to be very reliable, which was one of OCWA’s criteria for technology investments.

Thanks to improved data acquisition and control capabilities, OCWA’s personnel are better equipped to handle issues that arise at the plant. Managers, operators, and technicians can view the water treatment processes from any one of the onsite HMIs or computers. What’s more, they can monitor and control the company’s water distribution operations without ever leaving the Marcellus site.

The ability to monitor filter beds and other processes closely with real-time field data has reduced operator reaction time and ultimately improved plant efficiency. It has also increased security and allowed for more accurate reporting of water quality.

From an engineering and maintenance perspective, the recent technology upgrades provided additional troubleshooting tools in a convenient package, which is independent from the control system. All I/O is visible though the plant’s Ethernet network—even in the event of a complete PLC shutdown.

OCWA can now maintain a consistent, high quality water treatment operation without unexpected downtime and costly repairs. And plant operators have gained the necessary means for real-time monitoring of plant processes to ensure the quality of water meets all applicable requirements.

Jim McConahay, P.E.,  is senior field applications engineer for Moore Industries. Geoffrey G. Miller, P.E., is executive engineer, Onondaga County Water Authority.

For more information, visit:

www.emersonprocess.com

www.miinet.com

http://ocwa.org



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.