Gas Technology: Tankless solution saves money

The solutions to reducing commercial and industrial energy bills are not always obvious, but with work and some help from your utility you can find them.

05/02/2012


Owner Works with Utility to Reduce Energy Bill

 

The solutions to reducing commercial and industrial energy bills are not always obvious, but with work and some help from your utility you can find them. An example is the steps taken at Champion Cleaners in Birmingham, Alabama. Here, a representative of Alagasco suggested the owner switch to tankless water heaters and replace a boiler. The owner now uses 25% less gas at the facility.

Looking for an Answer

Champion Cleaners operates three laundry and dry-cleaning facilities near Birmingham, Alabama. At one of the facilities, the one in Vestavia, the owner, David Whitehurst, asked for help from his gas supplier, Alagasco, to reduce his energy bill. He also wanted achieve a better supply of hot water when needed for cleaning operations.

The Alagasco representative, Clay Erwin, studied the installation looking for potential energy saving opportunities. He suggested that the owner replace an existing 100-gallon tank-type water heater with tankless units. In addition, he recommended replacement of an older boiler with a new high-efficiency vertical unit. The boiler selected was the Cleaver-Brooks Clearfire unit, with full- and part-load efficiencies up to 88%.

Consistent Hot Water

Owner Whitehurst had mentioned that one problem he had encountered was inconsistent water temperatures when conducting cleaning operations. Erwin found that the tank system was undersized for the periodic heavy hot water demands, and recommended replacement of the tank water heater with three tankless units that would supply on demand ample hot water at exactly the temperature needed. Three tankless units by Rinnai were installed on an exterior wall of the building. This also freed up indoor floor space that had been used by the tank water heater.

With the improved system, all three units are used when Champion is operating its equipment at 100% capacity. However, when demand is lower, Champion saves energy by running just the number of units needed to produce hot water for the needed cleaning process. According to Whitehurst, “The new equipment is not just using less energy for every gallon of water, but also the precise temperature control gives me a spot-free garment, which is an improvement from my old water heater.”

Results Show at the Meter

Since installation of the new equipment, gas usage has dropped about 25%, using the same volume of hot water. The new equipment also reduced carbon emissions at Champion Cleaners by 25%. Whitehurst adds, “Never did I have to change the way I operate my business to achieve more efficient results. Every part of the process was seamless — from planning to installation to follow up service.”



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.