Frame, wire management: Save 25% on electrical panel designs

Satie Proclip and Prolight modular electrical panel frame and wire management systems shrink space requirements, cut material costs, increase productivity and reduce weight.

04/01/2010


A Satie Proclip panel frame shrinks enclosure, floor and surface space requirements by 25% to 50%, the company says.

A Satie Proclip panel frame shrinks enclosure, floor and surface space requirements by 25% to 50%, the company says.

Users can save up to 25% over traditionally designed electrical panels on combined material and labor costs by using Proclip and Prolight modular electrical panel frame and wire management systems from Satie.

Invented by Gino Faccin and Yves Paris, French electrical engineers with more than 45 years of combined electrical industry experience designing and wiring electrical control panels, the system is designed to help original equipment manufacturers (OEM), machine builders, system integrators, panel builders, switchgear manufacturers and others to shrink space requirements, cut material costs, increase productivity and reduce weight, with a more intelligent electrical enclosure design.

 

The patented Proclip system is designed for use in medium to large enclosures while the Prolight system is suited for small to medium enclosures with a shallow depth. Both systems can be mounted in any type of metallic or non-metallic industrial, modular, electronic/IT, or power distribution enclosure.

Satie says the systems allow users to shrink enclosure, floor, and surface space requirements by 25% to 50% while providing a reserve for future system expansion, upgrades or retrofits. Proclip and Prolight systems are made of high-strength, lightweight, extruded aluminum, and meet or exceed the DIN 50018 corrosion standard. They also are CSA approved (C22.2 No.14-05 and C22.2 No. 0-M91), and UL Recognized (UL 508A - NITW2).

Side view shows an assembled and wired Satie Proclip panel.

Side view shows an assembled and wired Satie Proclip panel with components on the front and wiring on the back in the wire duct. It also shows two offset DIN rails at the bottom of the panel frame.

The systems accommodate any size or type of electrical component, even non-electrical components like pneumatic directional control valve manifolds. Slotted panel profiles provide fast and easy component attachment using slide nuts and bolts, and profiles with integrated TS35/10 DIN rails for snap-on component attachment, the company says. A snap-in or bolt-on TS35/15 DIN rail is also available for those applications that require a taller profile or a 45-degree offset DIN rail for easier component accessibility.
Varied sizes and configurations are possible, in various increments. Satie provides customers with preassembled panel frames. That reduces component-to-panel assembly time by 80% - 90% with elimination of panel layout/tracing; punching, drilling or tapping holes; and cutting of DIN rail and wire duct.

 

 

Electrical systems designers can send a CAD drawing or hand-sketched diagram of a current or needed panel and within 24 hours Satie engineers will analyze the panel, conduct a takeoff and provide a Proclip or Prolight panel schematic and cost comparison. Assembled Proclip or Prolight panels are manufactured and shipped within 2 days of receiving a purchase order. Cost comparison is free of charge.

Satie North America, based in Toronto, Canada, is the North American subsidiary of Satie SAS, a manufacturer of the patented Proclip modular electrical panel frame and wire management system for use in electrical cabinets and enclosures. www.satiena.com

Also read from Control Engineering :
- Control panel design advice ;
- Control Panel Design: 60% Less Space - CP Packaging ;
- System Integration channel .
- Edited by Mark T. Hoske, editor in chief, Control Engineering , www.controleng.com.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.