Five ways to ensure better power quality

Unscheduled equipment downtime can result in delayed shipment and lost sales for the business, and loss of sleep and credibility for the plant operations manager.

Ani Dimusheva, Power Standards Lab

09/21/2011


Courtesy: Power Standards LabIn today’s manufacturing environment, unscheduled equipment downtime can be very costly to a plant operator, resulting in delayed shipment and lost sales for the business, and loss of sleep and credibility for the plant operations manager. While there could be countless reasons for productions lines grinding to a halt (worn components, software failure, natural disaster, and so on), bad power factor is one of the most common, persistent, and difficult-to-diagnose reasons. Not only can a voltage sag or spike wreak havoc on a plant’s production schedule, it can burn or damage expensive equipment and pose safety concerns as well. The cost of damaged equipment can equal and even exceed that of lost production.

One common reason for not dealing with a power problem is that facilities managers often feel that they do not have control over the power their utility provides, or enough knowledge to discuss it. This doesn’t have to be the case. Below are five ways a facilities engineer can get on even ground with the utility and ensure that power problems at least won’t keep their plant idle.

1. Monitor power quality all the time.

A power glitch causes your production to halt. You call your utility to complain. The utility sends over an engineer who hooks up a monitor to the main panel, leaves, then comes back a week later to read it. Nothing unusual has happened that week—your utility is off the hook, and the problem is back on you.

Sound familiar?

Embedding a permanent power quality monitor inside your panel keeps you in the know about your power, day in and day out. It is the single most important step you as a facilities manager can take to ensure you are not working in the dark.

Whether the problem originates inside your facility or out, the least you can do is to know.

2. Find out if the power quality problems you are experiencing are caused inside or outside your facility.

Typically, a voltage sag passed down by the utility (upstream voltage sag) will cause your current to drop. On the other hand, a surge in current accompanied by a voltage drop is a pretty good indicator that the voltage drop happened inside your facility (a downstream voltage sag).

You can use these general rules—and visual information like that in the graphs below—to determine where to start your troubleshooting process.

3. Have a record.

A picture is worth a thousand words, and when you are trying to prove a point to your utility, it’s priceless. A record of trends or a graph of a captured event (RMS or waveform) will help you discuss specifics, rather than general complaints, with your utility and help you resolve your problem faster.

4. Keep tabs on voltage trends.

To ensure “good power,” you really need to know what “good” means for your equipment. Keep tabs on the voltage you receive, and make sure it falls within your equipment’s standard operating parameters.  If it doesn’t, you may want to bring up the issue with your utility.

If the power you receive is within the expected parameters and you keep having equipment failures, testing your equipment is a good idea.  For more on testing, read Voltage Sag Testing for Commercial and Industrial Equipment, by Andreas Eberhard, Power Standards Lab.

5. Know what’s going on behind your UPS.

It is common practice to deal with pesky upstream voltage sags by installing a UPS. While this does save equipment inside the plant from getting burned or a process from being interrupted, it often obscures ongoing problems that are best resolved.

UPSs wear out faster when they are hit with bad power on a regular basis. If a UPS goes down earlier than expected, you are not only left unprotected but blind to what hit you. 

Monitoring both before and after the UPS will tell you:

  • What exactly your UPS is protecting you from, and
  • Whether your UPS is working the way you expect it to.

This information allows you to fortify your UPS backups if necessary, improving your power environment overall.

Dimusheva is a technical writer at Power Standards Lab. She can be reached at ani(at)powerstandards.com.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.