Sometimes the biggest obstacles to effective alarm management are cultural, not technical.

06/05/2012


Real-world Engineering BlogIn the wake of the Deepwater Horizon disaster, alarm management has moved once again into the forefront for many companies as they ask: “What is the best way to keep an operator from missing a key alarm when things start to go wrong? What are the obstacles to having an effective alarm management system?” In my experience, the decision to have, or not have, an alarm is more often cultural than it is based on a good operational analysis of the process. That’s why the alarm rationalization process is so necessary and beneficial. It strips away the cultural, “I want the operator to know about…” and replaces it with, “This is the most important thing the operator has to do.”

 

Many plant personnel do not appreciate just how significant this change is. Almost from the introduction of the DCS, its ability to generate more alarms than a human can effectively deal with was not appreciated by non-operators. Engineers and plant managers wanted the operators to know everything that was happening in their unit with the end result being just the opposite, particularly in upset situations. The DCS suppliers eventually gave us the tools to do conditional alarming which, for the most part, went unused by the typical project execution team because it wasn’t part of the scope. Process designers felt that every measurement should have the full suite of alarms and no one had the brief to question that. But things are changing.

 

ISA 18.2 outlines a methodology for developing an effective alarm management system by first requiring the plant to create an alarm philosophy document that defines the criteria for rating an alarm’s severity and urgency. The typical document classifies four levels of severity based on safety, environmental impact, or financial impact, and four levels of urgency based on how quickly the operator has to take a corrective action. A required operator response, other than to acknowledge that the alarm occurred, is a significant paradigm shift for most plants as a high percentage of current alarms are really for operator notification, often about something for which there is no corrective action. When one of the more catastrophic of those occur, all the operators can do is sit back, watch the flood of alarms resulting from the event that couldn’t be prevented in the first place, and, of course, wear out the horn acknowledge button.

 

The final solution rests with the management of the facilities, because ultimately it costs money to do the work required to implement and maintain a good alarm management system. It has to be in the culture of the facility that safety is a priority or the time and money required won’t be allocated. It also has to be in the culture that an alarm requires the operator to take a corrective action to prevent an undesirable incident.

 

Also read:

 

Managing alarms using rationalization, and

 

A rational approach to alarm rationalization

 

This post was written by Bruce Brandt. Bruce is the DeltaV technology leader at MAVERICK Technologies, a leading system integrator providing industrial automation, operational support and control systems engineering services in the manufacturing and process industries. MAVERICK delivers expertise and consulting in a wide variety of areas including industrial automation controls, distributed control systems, manufacturing execution systems, operational strategy, and business process optimization. The company provides a full range of automation and controls services – ranging from PID controller tuning and HMI programming to serving as a main automation contractor. Additionally MAVERICK offers industrial and technical staffing services, placing on-site automation, instrumentation and controls engineers. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.