Environmental Services Laboratory Relocation

New construction: Environmental Services Laboratory Relocation; Erdman Anthony

08/09/2012


The completed South Florida Water Management District Building project is shown. (Click to enlarge)Project name: Environmental Services Laboratory Relocation

Location: West Palm Pearch, Fla.

Firm name: Erdman Anthony

Project type, building type: New construction, research/lab/high-tech

Project duration: 2.5 years

Project completion date: Feb. 29, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $4.2 Million

This photo shows the exhaust vents on the roof. (Click to Enlarge)Engineering challenges

Challenge 1: The owner desired to equip the building with a generator sized to provide backup electrical power for the entire building, including HVAC and those systems necessary to sustain normal operations. The challenge in achieving this requirement was to balance the cost of providing a generator sized to withstand the inrush associated with the simultaneous restart of motor-driven equipment with that of a generator sized to handle just steady-state loading.

Challenge 2: Another challenge was to devise a lighting control system that could execute a complex scheme whereby traditional manual switching was required during normal operating hours and automatic control, using occupancy sensors, was desired during off hours.

Solutions

Solution 1: After evaluating the cost of both options, the design team settled on a generator with a lower rating sized basically to handle only the steady state loads. The inrush issue was resolved by providing a control scheme, implemented via the BAS, which would stagger the restart of major equipment upon transfer to generator power. This solution not only reduced the upfront cost of the backup power system but also minimized the overall space required for the system.

Solution 2: To achieve this, local lighting controllers were used on each floor, which not only achieved the desired functionality but also provided the owner with the luxury of making future control changes via simple programming without the need for rewiring.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.