EN ISO 13849-1; 2008 – Are We Ready By December 2011?

Some companies and the machine safety folks are having difficulty meeting the new EN ISO 13849-1; 2008 requirements by the end of this year. So, my question remains, ARE WE READY? SIL (safety integrity level) and Cat (Category) are fading out; SIL and PL (Performance Level) are becoming the new basis for machine guarding and hazard mitigation.

06/20/2011


JB Titus, CFSESome companies and the machine safety folks are having difficulty meeting the new EN ISO 13849-1; 2008 requirements by the end of this year. Various segments of industry are moving forward to adopt and comply with this safety standard. Compliance with 13849-1 promises improved safety and possible opportunities to properly apply current technologies in ways that improve machine performance, efficiency, and plant productivity.

     So, my question remains, ARE WE READY?

 

Machinery Directive requirements for functional safety - percentage currently compliant, Control Engineering, VDC Research survey     Surveys suggest different answers to this question. Last April Control Engineering completed a Webex survey regarding the adoption of EN ISO 13849-1 and EN/IEC 62061. Respondents indicated that 81% expect to comply by the end of this year. However, the respondents also indicated that 80% needed tools or outside assistance to meet this goal. The other 20% indicated that they would comply using in-house resources. On the other hand, at various trade shows, attendees are asked for a show of hands regarding the same compliance question. The results vary but seem to reflect the general trend of around 10% expecting to comply with these standards by the end of this year.

     In my opinion, these studies are not scientifically conducted, however, one does get a general idea that:

  • Folks are aware of the revised and updated standards and their requirements.
  • Industry is aware of the effective date at the end of this year.
  • And, that industry does feel a need to adopt and/or comply with the requirements.

     We can argue the specifics all day long, however, doesn’t it seem that machine safety will be going through a paradigm shift over the next several months and perhaps years as SIL (safety integrity level) and Cat (Category) fade out as SIL and PL (Performance Level) become the new basis for machine guarding and hazard mitigation?

     Let’s hear your ideas. Submit your ideas, experiences, and challenges on this subject in the comments section below. Click on the following text if you don't see a comments box, then scroll down: EN ISO 13849-1; 2008 – Are We Ready By December 2011?

     Did you see the Safety Integration Webcast?

     Related articles:

Designing In Machine Guarding   

EN ISO 13849-1; 2008 - Are We Ready? - Part 2

Trouble Implementing ISO 13849-1; 2006 per the European Machinery Directive

Contact: www.jbtitus.com for “Solutions for Machine Safety”.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.