EC: CNX Wireless System

Hardware - Handheld test, measurement, calibration: The Fluke CNX Wireless System simplifies troubleshooting by enabling up to 10 simultaneous electrical and temperature wireless measurements. This is a Control Engineering 2013 Engineers' Choice Awards Honorable Mention.

11/12/2012


The Fluke CNX Wireless System simplifies troubleshooting by enabling up to 10 simultaneous electrical and temperature wireless measurements. This is a Control Engineering 2013 Engineers' Choice finalist.The Fluke CNX Wireless System, the first set of test tools that wirelessly connects multiple measurement modules and sends simultaneous readings to a master device up to 20 meters away, allowing users to troubleshoot problems quickly and efficiently. The rugged, customizable tool set allows users to choose various measurement modules based on their specific troubleshooting scenario.

At the core of the Fluke CNX Wireless System is a CAT III 1000 V / CAT IV 600 V multimeter with a screen that displays its readings along with live readings from up to three other measurement modules. For more complex troubleshooting, users can view live measurements from up to 10 modules simultaneously on a computer equipped with the CNX PC Adapter. The modules, which include AC Voltage, AC Current Clamp, iFlex AC Current Clamp, and K-Type Temperature units, can take live measurements or log up to 65,000 sets of data. Logged data can be saved to a computer in .csv format.

The Fluke CNX system allows users to place modules in hazardous or awkward places and then watch the readings from a safe distance. For example, a technician can de-energize a panel, connect voltage or current modules to all three phases, close and re-energize the panel, and then conveniently read the measurements outside the arc flash zone. By leveraging the most common electrical test tool—the multimeter—the Fluke CNX system allows technicians to extend their existing capabilities and skills, helping them meet market demand for more complex three-phase work without re-training on more complex test tools.

www.fluke.com 

www.fluke.com/cnx  Fluke Corp.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.