Drexel University Chestnut Street Housing
New construction: Drexel University Chestnut Street Housing, Bala Consulting Engineers Inc.
Source: Bala Consulting Engineers Inc.
Project name: Drexel University Chestnut Street Housing
Location: Philadelphia, Pa.
Firm name: Bala Consulting Engineers Inc.
Project type, building type: New construction, school (college, university)
Project duration: 2 years
Project completion date: Sept. 1, 2013
Project budget for mechanical, electrical, plumbing, fire protection engineering only: $21 million
Engineering challenges
The three new residence halls will wrap two sides of a city block and are being constructed between the public sidewalks and existing university buildings. Prior to beginning construction of the new buildings, steam, electric, telephone, and cable utilities serving the existing buildings had to be relocated into corridors between the residence halls. Mechanical and electrical spaces within the existing buildings were no longer located in perimeter spaces, and new
ventilation and cooling pathways were identified through both the existing and new buildings. Separate mechanical systems were required for the apartment tower and the townhome units. The stacking nature of the apartments was ideal for vertical stack water source heat pumps; one heat pump is provided in each apartment with limited ductwork in each living space. The townhomes alternate living rooms and bedrooms and interior walls do not align; Variable refrigerant flow (VRF) systems with individual fan coils are utilized. In all cases, the ability to simultaneously heat and cool different living units or interior spaces is maintained.
Solutions
All three buildings are served from the same central utilities. High-voltage electrical service, natural gas, domestic water, domestic hot water, and the circulating heat pump loop are all extended from building to building through common spaces and crossing below grade in the areas between buildings. Appropriate access to all utilities was maintained.
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.