Don't overlook key steps in the safety process

Having a clear plan with executive management and safeguarding yourself against potential hazards for both the short- and long-term is vital

John Peabody, Omron Automation and Safety

11/10/2012


What am I missing in my safety program?

If you think about it too hard, it’s one of those questions that can keep you awake at night. What am I missing in my safety program? Many companies would answer this question by looking at their machines and making sure that all the safeguards are in place. The answer, however, isn’t in the factory—it’s most likely in the corporate offices.

But where does it start? Safety starts at the top and filters down. In a successful program, everyone’s involved. In the most successful companies, safety is a separate item on the agenda for meetings of the board of directors. It’s that important.

First and foremost it’s important to have a clear plan with buy-in from executive management to assess all hazards and a commitment to safeguard (reduce the risk) for each hazard per the plan. This can and should be a long-term plan with milestones and budgets agreed to by the “top brass.” It should have approval for the necessary funding. Without these simple steps, you end up with an environmental health and safety (EH&S) person at the corporate level who is frustrated because he cannot get done what he knows needs to be done.

After management buy-in, from the perspective of the EH&S professional, the following often-overlooked information and processes need to be understood and implemented for a complete and lasting solution: 

  • Risk assessment process—always the beginning of the solution for a safe factory
  • Understanding of the hierarchy of controls (engineered solutions vs. administrative solutions)
  • Understanding of safety circuit design (including practicality, cost, etc.)
  • Identification and application of pertinent regulations (OSHA), standards (ANSI, NFPA, etc.), or directives (machinery directive, plant/corporate standards, etc.)
  • Determination of an internal acceptance of “acceptable (tolerable) risk” (including the difference between being “compliant” and being “safe”)
  • Stakeholder (operations, production, maintenance, etc.) feedback and buy-in for all remediation plans
  • Qualified remediation experts (either in-house or third-party)
  • Understanding of cost vs. value (cheaper usually isn't better)
  • Complete lifecycle review process (Plan, Do, Check, Adjust)
  • Administrative controls (training, documentation, supervision, maintenance, etc.) to maintain safeguarding solutions and practices.  

Whether you tackle these steps with internal resources or hire outside experts to handle your machine safeguarding, if you understand these points—and get executive support and buy-in—you are well on your way to a safer, more efficient factory. 

John Peabody is vice president of business development for Omron Automation and Safety, Fremont, Calif. www.sti.com.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.