The short answer is no, primary windings of liquid-filled transformers don't fail. Here's why.

Joe Guentert; Owner, Power Distribution Systems

05/17/2012


VPI failure at ends of windings, and flashover to ground.In the same 35-year period of time, I’m counting up the number of failures of primary windings of liquid-filled transformers I’ve experienced, or have been reported to me, or that I’ve heard about or read about, caused by vacuum breaker switching in data centers. It’s exactly NONE.

In that same period of time, I’ve commissioned well over 500 liquid-filled transformers installed indoors and outdoors at large data centers, and have experienced zero primary winding failures, despite hundreds of deliberate switching operations of upstream vacuum breakers during commissioning and later plant operations, under all possible conditions of system loading and connection configurations in various primary loop arrangements. Nearly half of these had 34.5 kV primaries, as nasty and tough and ugly a utility distribution voltage as there is on the planet (more to come about system voltages and their relationship to the problem).

Again, I’m only relating my personal experiences and observations and opinions here. If anyone knows of failures of primary windings in liquid transformers installed in data centers caused by this phenomenon, I would like very much to learn about them.

Some Explanations for the Differences 

 

Clients ask me, “if you believe all of this so strongly, what logical reasons are there to explain these differences?”  Here are some of the reasons:

  • Of the 30 or more failures of dry-types I’ve personally investigated, approximately 20% of those were failures deep within the windings, suggesting oscillatory transients at the resonant frequency of the transformer, most likely caused by re-strike ignition phenomena during breaker opening at light transformer loading. (All of those failures coincidentally had secondary loads of 6 or 12 pulse input rectifiers in the front ends of static UPS systems).
  • But, the large majority of the failures I investigated occurred at the ENDS of the primary windings, or at delta corner jumper leads, or at tap connections, and often flashed over to the grounded steel enclosure or to grounded core steel. I’ve come to believe that a major part of the problem was the connections to these live parts were insulated only by air, and that arrangement provided an all-too-easy flashover path on seeing a sudden big blast of L(di/dt) come shooting out the ends of the windings.
  • Moreover, these failures occurred in areas where winding insulation was changing from paper to air-only, and where the line impedance was also chancing. Had all these connections been instead immersed under a high dielectric strength insulating fluid, I believe that many of these failures would not have occurred.
  • In other words, I think that a number of these failures might not have actually been WINDING failures. They were more likely terminal connection failures due to the inadequate dielectric strength of the surrounding air, and the actual winding damage that did occur might have been mostly just collateral damage. (Interestingly, the majority of these did not even have surge arresters of any type connected to the winding terminals). More discussion about this coming next week.


No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.