Designing labs, research buildings: Electrical, power systems

Labs and research facilities house sensitive equipment and must maintain very rigid standards. Electrical and power systems are of key importance.

05/28/2013


Nedzib Biberic, PE, LEED BD+C, Mechanical Engineer, PAE Consulting Engineers, Portland, Ore. Courtesy: PAE Consulting EngineersMichael Chow, PE, CxA, LEED AP BD+C, Member/Owner, Metro CD Engineering LLC, Powell, Ohio. Courtesy: Metro CD EngineeringDavid S. Crutchfield, PE, LEED AP, Division Manager, RMF Engineering, Baltimore. Courtesy: RMF EngineeringDave Linamen, PE, LEED AP, CEM, Vice President, Stantec, Edmonton, Alberta. Courtesy: StantecJay Ramirez, Senior Vice President, ESD Global, Chicago. Courtesy: ESD Global

Participants:

Nedzib Biberic, PE, LEED BD+C, Mechanical Engineer, PAE Consulting Engineers, Portland, Ore. 

Michael Chow, PE, CxA, LEED AP BD+C, Member/Owner, Metro CD Engineering LLC, Powell, Ohio 

David S. Crutchfield, PE, LEED AP, Division Manager, RMF Engineering, Baltimore

Dave Linamen, PE, LEED AP, CEM, Vice President, Stantec, Edmonton, Alberta

Jay Ramirez, Senior Vice President, ESD Global, Chicago  


CSE: What’s the one factor most commonly overlooked in electrical and power systems in laboratories?

Chow: Most laboratory renovations projects require more power than what was used for the existing laboratory. This is typically due to ventilation requirements requiring larger fume hoods along with other increased electrical loads. Many renovation projects require upgrading the electrical systems, and that may impact the project’s budget.

This lab included a vivarium on the ground level, one level of offices, and three levels of labs. Courtesy: RMF EngineeringCrutchfield: We have seen that various labs that use older testing equipment (40+ years) that was originally slated to operate on 240 V only either underperforms when connected to 208 V or burns out. In renovation work, surveying this old equipment so that we can properly connect it is critical to the performance of the equipment and the lab relying on it.

CSE: How have sustainability requirements affected how you approach electrical systems?

Crutchfield: Beyond the obvious daylighting and occupancy controls, we now see a desire among owners for power that is from renewable sources or generated on-site. On-site generation tends to be more of a showcase for labs as the plug loads we see for the lab equipment generally makes total on-site power generation impractical.

Chow: Typical laboratories consume significantly more energy per square foot compared to a typical office building. Some ways to save electrical usage include: providing a lower ambient light level coupled with task lighting versus using a common 100 foot-candle level for the entire space, and use of occupancy sensors and daylight sensors to automatically turn off and/or dim artificial lighting. CO2 sensors can also save energy by reducing the amount of ventilation required when the space is unoccupied.

CSE: When commissioning electrical/power systems in labs, what issues do you face?

Chow: Issues can arise if the commissioning authority is not contracted or engaged until the construction phase. Problems may arise if the design engineer has electrical specifications that were used for bidding that do not include adequate commissioning specifications. For example, an electrical contractor may be responsible for certain types of testing (e.g., power quality) for witness by the commissioning agent. An issue can arise if the commissioning agent has a functional test that is required but the electrical contractor did not have this test in its bid. Costly change orders and disruptions to the project schedule can result if commissioning is not incorporated early in the design phase.

Crutchfield: The most common thing we see is the coordination of the non-emergency motor starting protocols and the emergency motor starting protocols when under generator power. Staggered starting (steps) of large motors to lessen the inrush current is often necessary but many times overlooked in the control sequences, and all the motors attempt to start simultaneously. A proper control sequence to bring motors back on line in steps can alleviate this problem of overloading the generator or simply not having enough power to start the motor during generator use.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
2016 Engineering Leaders Under 40; Future vision: Where is manufacturing headed?; Electrical distribution, redefined
Strategic outsourcing delivers efficiency; Sleeve bearing clearance; Causes of water hammer; Improve air quality; Maintenance safety; GAMS preview
World-class maintenance: The three keys to success - Deploy people, process and technology; 2016 Lubrication Guide; Why hydraulic systems get hot
Flexible offshore fire protection; Big Data's impact on operations; Bridging the skills gap; Identifying security risks
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Applying network redundancy; Overcoming loop tuning challenges; PID control and networks
Driving motor efficiency; Preventing arc flash in mission critical facilities; Integrating alternative power and existing electrical systems
Package boilers; Natural gas infrared heating; Thermal treasure; Standby generation; Natural gas supports green efforts

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This article collection contains several articles on the vital role that compressed air plays in manufacturing plants.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
This article collection contains several articles on strategic maintenance and understanding all the parts of your plant.
click me