Conducting data collection - beware of interference

Users involved in data collection on a motor who are aware of the potential reasons and risks for interference can be instrumental in improving productivity and safety.

11/16/2011


Ensuring proper grounding will make data management a better managed and safer process. Photo courtesy of Allied Reliability.In April of 2010, I took over the responsibilities of vibration data collection and analysis at a salt evaporation plant in upper New York. The site has a history of having a robust condition-based monitoring program using infrared, ultrasonic, motor current analysis, and vibration technologies. For vibration, the site uses Commtest equipment and software. Its data collector was a VB7.

On my first day of route data collection, I came upon a variable speed pump. I attached the transducer to the motor and attempted to enter the machine speed using the keypad. When I pressed a key, the digit would be entered between two and four times onto the screen. I cleared the speed on the screen and tried again. The same thing happened. I attempted a third time with the same results. Knowing I could set the speed in the Ascent software, I took the data using the default speed. When I analyzed the data, I would set the speed using the run speed peak as a reference.

In March of 2011, an e-mail was distributed within my group concerning other analysts having the same issue. We were informed that a software patch was being developed that would correct the problem. Knowing others were having the same problem, I decided to further investigate the cause of the issue.

I attempted to take data with the VB7 on a pump that I knew would produce the symptom. I attached the transducer and tried to enter the speed. I had the same results as before. This made me think the cable was picking up stray radio frequencies and causing interference in the collector. I took the transducer off the motor and attempted to enter the speed. I still had the same issue. I walked away about 10 ft (3.3 meters) from the pump motor and tried to enter the speed. I had no problems. This piece of information led me to believe there was some sort of radio interference coming from the variable frequency drive.

My first idea was to consider the ground for the motor, as insufficient grounding can cause bearing defects by arcing across the bearing surfaces. I had not seen any vibration signatures of bearing fluting; however, I asked the site maintenance planner to have an electrician attach an auxiliary ground to the motor. When the electrician received the work request he told me this could not cause the issue. The electrician then installed the auxiliary ground.

After the electrician installed the ground, I attempted to take measurements again on the motor. I entered the digits for the speed with no issues whatsoever. I moved the transducer around the motor to see if there was a place where I could cause the digit error. I could not replicate the problem. This solved my data collector problem.

I told the electrician the ground fixed my data collector issue. He thought for a moment and said there must be a ground issue with the motor he needs to repair. He would attempt to repair the ground during the next outage.

While running the same route the next month, I noticed another pump causing the same problem. This pump had not been causing problems before. I told the planner about the pump the same day and also told the electrician. I was told they would inspect both of the motors during the next outage.

The first motor was inspected. Two bolts mounting the motor junction box to the motor were found in the bottom of the box. Two other bolts were found to be extremely loose. The bolts were reinstalled and tightened.

The second motor was inspected. The bolt holding the ground cable was too small for the bolt hole. The nut holding the ground cable was pulled inside the bolt hole to a point where the lug on the ground cable did not touch the housing. The motor was being grounded by the hex points of the nut.

Both of these motors, while operating normally, were improperly grounded. This lack of ground was not causing an immediate problem. However, this deficiency may cause two significant problems.

The most important issue is one of safety. The electrician who inspected the motors said these were traps waiting to catch someone. The environment in the evaporative plant is wet. Water and electricity are a fatal combination. Under the right conditions, someone working in the area could have been electrocuted. The ground is the last resort to divert electricity from passing through a person if a component in the motor short circuits.

The second issue that could have been caused is bearing fluting. This is caused by the rotor arcing across the bearing components from stray electrical fields. Bearings that are fluted may operate for a period but should be considered to be a failed bearing.

At this site, we now have a procedure if the VB7 data collector does not accept key presses correctly. We report the situation immediately to the planner. The planner writes a work request to have an auxiliary ground placed on the motor. This request is expedited as it could represent a major safety issue. The motor ground is then inspected at the next outage.

Conclusion

If a Commtest VBx data collector produces multiple key strokes while taking measurements on a motor, have the ground on the motor checked as soon as possible. This may at least save a piece of equipment and could possibly save a life.

Green is lead analyst for Allied Reliability. She can be reached at 706-871-4687 or at aubrey_green(at)crgl-thirdparty.com.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.