CERN’s Large Hadron Collider boosts superconducting magnet performance

Magnetic field measurement instrument board achieves 100 times greater frequency bandwidth and resolution than previous design, contributing to ultra-high-precision beam-forming in world’s most powerful particle collider.

10/31/2011


CERN technician connects superconducting magnets in the Large Hadron Collider (LHC) tunnel. Analog Devices' processing technology helps CERN’s LHC achieve the highest possible superconducting magnet performance. CERN photoThe European Organization for Nuclear Research (CERN) in Switzerland and the University of Sannio, Benevento, Italy, have collaborated on the design of an advanced instrument for measuring magnetic fields in CERN’s Large Hadron Collider (LHC) superconducting magnets. Called the Fast Digital Integrator (FDI) board, this measurement device uses Analog Devices’ A/D converters, analog multiplexers and DSP components to provide the LHC with the highest possible performance achieved to-date in measuring magnetic fields.

The new FDI board enables 100 times the resolution and frequency bandwidth of the previous generation digital integrator. This significant improvement in dynamic range enables scientists to detect even more minute artifacts that contribute to magnetic field variations, field decay and other time dependent phenomena typical in high-field superconducting accelerator magnets that all negatively affect the quality of particle beams under study. The new FDI boards are used at CERN to measure magnetic flux at 10 revolutions per second through fast-rotating calibrated coils that evaluate the magnetic field produced by the LHC’s 8 Tesla accelerator magnets.

“Prior to the FDI board, the available electronic components were not suitable in terms of accuracy or resolution, which in the case of the Large Hadron Collider easily approaches 10 parts per million,” said Pasquale Arpaia, professor of engineering at the University of Sannio.  

The LHC is the world’s largest and highest-energy particle accelerator, as well as the biggest machine ever built by humans. Construction started in 2003, and the LHC was operational in 2008. Its mission is to probe some of the most fundamental questions of physics and advance the understanding of the most fundamental laws of nature.

www.analog.com

 Caption

CERN technician connects superconducting magnets in the Large Hadron Collider (LHC) tunnel. Analog Devices' processing technology helps CERN’s LHC achieve the highest possible superconducting magnet performance, the company said. The LHC is the world’s largest and highest-energy particle accelerator, as well as the biggest machine ever built by humans. Its mission is to probe some of the most fundamental questions of physics. Courtesy: CERN



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.