BEST PRACTICES: Energy Management

The electric power system is in the midst of monumental changes driven by the need to address rising energy costs and demand.

01/03/2011


The electric power system is in the midst of monumental changes driven by the need to address rising energy costs and demand. Utilities and grid operators are faced with the challenge of managing increasing energy demand, as well as handling new pressures on the electric grid from renewable energy sources.

The industrial sector currently consumes 25% of all the energy flowing through the electrical grid in the U.S., making it the largest electric end-use sector. Energy is one of the top ranking expenses in facility operations, and industrial facility managers are increasingly seeking ways to mitigate energy costs.

One option for plant managers and operators to consider is demand response. This program provides a financial incentive, through reduced electricity costs or incentive payments, for end users to cut their energy use during peak hours when the grid is overloaded. The programs are designed to induce lower electricity use at times of high wholesale market prices or when system reliability is jeopardized.

With energy use expected to grow by 22% by 2030, demand response provides a valuable solution to meet the challenges of the increasing demand and to mitigate the impact of rising energy costs for industrial facilities. Deregulation of the wholesale electricity market gives industrial customers the opportunity to participate in early manually-based demand management activities which assist in maintaining mandated reserve margins and decreases operating costs.

The Federal Energy Regulatory Commission Order 719 opens energy markets to the demand side by requiring Regional Transmission Operators and Independent System Operators to accept bids from demand response resources for ancillary services and energy. This gives customers the opportunity to participate in various demand response programs.

The goal of FERC 719 is to allow for true competition by eliminating barriers to participation of demand response in the organized power markets by ensuring the comparable treatment of resources. The competitive pressure that demand response provides will lead to increased awareness of energy usage and aligns market prices more closely with the value customers place on electric power.

FERC order 719 is beneficial for the industrial sector in particular due to the amount of energy facilities’ need for proper operations. It allows industrial customers to participate in demand management activities like choosing not to use electricity when prices are high and to sell unused megawatts or megawatt hours back to the wholesale electricity market at a profit, presenting industrial customers with an opportunity to mitigate rising energy costs.

An organization we have worked with, a U.S. Air Force base, had massive electric utility bills, which averaged about $20 million per year. Additionally they faced a unique set of challenges due to aging infrastructure, high security requirements, and government-imposed energy reduction mandates. They began using our PowerLogic power monitoring system in order to monitor and manage data throughout the base. The system was instrumental in reducing their electrical usage to comply with federal mandates and reduce costs and enabled them to effectively participate in a demand reduction program with their electric utility.

The base came to mutually agreed upon reduction efforts with the utility and receives credits on their bill for meeting those objectives each month. The monitoring system provided visibility into their facility allowing them to track trends relative to influencing factors to determine if they were being effective with their conservation efforts. For example, if the General says, “Turn the A/C off when you’re not in the room,” they are able to see if that paid off or not and if it’s not successful at reducing their consumption they can redirect their efforts. The base reaped significant savings as a direct result of their participation in the demand reduction program, in some instances receiving more than $20,000 in credits in a single week.

Demand response programs have been introduced across industries. The industrial sector has been slow to adopt demand response programs due to concern from plant managers about the risk of jeopardizing their operations, as energy reliability is critical.

Only about one in eight manufacturers use any form of load control, and the adoption rates for demand response in the industrial sector remains very low. A major reason for the low adoption rate in the sector is that many plant managers are concerned about shedding loads which are fundamental to operations and may jeopardize productivity.

Industrial customers have a variety of options available for participation. The simplest does not involve process but the building envelope. In a large facility, HVAC set points, lighting or other non-critical elements often provide enough load shed to qualify for program participation and significant revenue. The next step up is shifting certain non-critical processes to off peak periods. This might include pumped liquids storage or raw materials staging. Since demand response events are of limited duration, slowing motor intensive process lines, when allowable, can be effective.

When demand response performance revenues have been high, plant managers have interrupted shifts, even sending workers home, because demand response revenue was worth more than the lost production time. Clearly, this is more appealing in a batch process rather than a continuous one. There are a wide variety of programs which provides flexibility to enroll in the type of program most compatible with the type of industrial process. Rules vary by location, but in general, the greater the curtailment and the faster the response capability, the greater the potential revenue.

Demand Response 2.0

In order to expand customer participation in DR programs and reach the maximum potential of DR, the industry is moving towards a more automated and intelligent demand response, often referred to as DR 2.0. Manual DR has proven to be very successful in terms of managing an impending peak power crisis, but DR 2.0 introduces a more active, automated, and integrated version of DR, which aims to prevent such emergencies before they even occur.

The technology needed to implement DR 2.0 programs already exists today, but certain barriers must be addressed in order to implement DR 2.0. Some of the issues include a need for costly technology installations, data being collected in silos, and national policy which is confused by different regulatory agencies operating in silos. Although much remains to be done, DR 2.0 will be faster, less expensive, and more targeted then adding generation and delivery infrastructure.

DR 2.0 takes advantage of industrial SCADA gear and sophisticated programming algorithms coupled with newer assets like variable speed drives and logic control to make small and rapid adjustments to processes to optimize energy demand. In turn, this capability allows plant managers to negotiate favorable energy supply contracts and to lower overall operations costs. In essence, today’s DR programs require special treatment and exception management. In contrast, DR 2.0 techniques build efficient energy strategies into process logic. This makes it automatic, imperceptible and profitable.

 Large end use customers are migrating to a “prosumer model” where they are not only consumers of electricity but also producers of services to Smart Grid through DR 2.0. With this transition we can not only provide energy cost savings we can now provide new revenue streams to the customer and a higher level of sustainability. More information about these services and opportunities can be found at the Peak Load Management Alliance which is a not for profit trade association for the demand response industry.

 www.peaklma.com

- Ross Malme is business director of the Demand Response Resource Center for Schneider Electric and an Executive Committee member of the Peak Load Management Alliance, which is a not for profit trade association for the demand response industry.

Return to BEST PRACTICES: Finding the way forward



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.