Baylor College of Medicine Special Care Center

Renovation: Baylor College of Medicine Special Care Center; Smith Seckman Reid Inc.

08/09/2012


Baylor College of Medicine Special Care CenterProject name: Baylor College of Medicine Special Care Center

Location: Houston, Texas

Firm name: Smith Seckman Reid Inc.

Project type, building type: Renovation, hospital

Project duration: 2.5 years

Project completion date: Dec. 2013

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $17 million

Engineering challenges

Challenges included preparing documents to complete the building infrastructure of a previously unfinished shell building for chilled water, steam, electrical, emergency power, domestic hot and cold water systems, and heating hot water systems in concert with architectural work to create required 2-h separations needed with functioning life safety systems to (1) comply with the requirements for an unoccupied, yet code-compliant building and (2) identify MEP equipment needed or anticipated to be utilized to serve several phases of finish-out of portions of the building while keeping construction costs of these systems limited to the potential project finish-out. Challenges faced by MEP engineers and designers included survey of existing equipment already installed but not placed into service; identification of equipment purchased but not yet installed; identification of existing equipment capacity and its capability to serve the proposed finish-out, which in some instances was different than the original design intent; and a determination as to the condition of the equipment due to its sitting idle and unused in an enclosed but unconditioned environment.

Solutions

Solutions to the challenges, while seemingly obvious, required a lengthy thought and planning process that involved the owner and the original installing contractors. Additionally, to establish a starting point, we needed to review existing product submittals; review work actually installed versus original design intent to determine where work was stopped and if it was completed; review and discuss what work was previously permitted, and if there were open permits for any of the work to determine what documentation was needed to complete the work; and, finally, to determine how remaining shell spaces and building smoke control would be accomplished within a partially occupied and finished building, which just happened to be a high-rise building with both I2 and B occupancies. We also needed too identify what should be in place to be able to finish out the building under an aggressive completion schedule once the space planning was completed. The project was initiated in early summer and the enclosed but unconditioned, nonventilated building (in Houston) created its own unique challenges when we surveyed the building. Documents were prepared in four phases to address the project requirements in an orderly process, so the work could be competed, inspected by the city, and permits closed before new work could proceed under new permits in order for the infrastructure to be ready and able to serve the finish-out.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.