Automation, integrated options key for copper mine's success

Comprehensive automation and power, integrated operations center help Antofagasta’s Esperanza copper mine in Chile reach peak productivity

02/09/2012


ABB has supplied power and automation solutions for the Antofagasta Esperanza copper mine in Chile. Technologies include three of the world’s largest gearless mill drives, process and electrical control systems, power quality systems, a substation and an ABB System 800xA integrated operations center that controls all production, including onshore facilities at a purpose-built port 145 km from the mine. Esperanza officially opened in April 2011.

The three huge grinding mills that grind the ore into particles. Each ABB gearless mill drive system comprises a large gearless synchronous motor that is wrapped around the mill like a ring. The power and control equipment of the system is located in a pu

It is reportedly the first large-scale mine to use raw seawater in its metal-producing processes. Water is pumped from the coast through a 145-kilometer pipeline to the mine, 2,300 meters above sea level.

Helping with productivity and efficiency, ABB products and systems drive the huge grinding mills, control the mine, and power the purpose-built port and seawater pumping station on the coast.

Esperanza has a daily throughput capacity of 97,000 tons of ore. After extraction in the open-pit mine, the ore is crushed in a huge 40-foot semi-autogenous grinding (SAG) mill and two 27-foot ball mills; all three are driven and controlled by ABB gearless mill drive systems with power output of 22.4 MW and 18.6 MW, respectively.

The mine’s conveyor belt system is dynamically controlled by ABB medium-voltage variable speed drives. Courtesy: Antofagasta

When the contract for the mine’s gearless mill drive systems was awarded to ABB in 2007, Esperanza was only the second mine in the world to install a SAG mill - and the first to install ball mills – with these capacities and power ratings. ABB has installed larger ones subsequently at other mines, but at the time they were at the technological limit of what SAG and ball mills were mechanically capable of achieving.

The gearless mill drive systems enable the grinding mills to achieve the best possible grinding results and process efficiency by adjusting the speed or direction of the mega-sized mills and ensuring a constant particle size, regardless of changes in the size or hardness of the ore.

The ore is transported to and from the grinding mills by long heavy-duty conveyor belts. The belt motors are driven by  ABB medium-voltage variable speed drives, which provide dynamic control of the motors and enable soft starting and stopping of the belts, thereby saving energy and minimizing mechanical wear and tear.

After processing, the concentrate is transported through the pipeline to the port where it is thickened and stockpiled, ready for loading onto ships. An ABB 110/23 kV substation connects the site and its onshore and offshore facilities to the power grid.

A mine and ore processing plant like Esperanza consumes huge amounts of electric power and requires power quality equipment to maintain voltage stability and a high power factor. The site’s power distribution network is controlled by an ABB supervisory control and data acquisition (SCADA) system and is protected from destabilizing voltage spikes and harmonics-induced power losses by an ABB filter system.

The ABB System 800xA distributed control system integrates all automation systems - process, power distribution, gearless mill drive, motor and conveyor, pipeline, and port – into one control environment and provides interfaces with the plant management and maintenance systems.

The complete process - including the mine, processing plant and dedicated port facility - are monitored and controlled from a single control room, an ABB EOW-x (Extended Operator Workplace) Integrated Operations Center. Courtesy: Antofagasta

Full visualization and control of the whole process (crusher area, processing plant, pipelines and port) is provided by ABB’s EOW-x (Extended Operator Workplace) Integrated Operations Center - a unified and ergonomic control room environment that is designed to maximize operator efficiency. 

ABB

www.abb.com 

- Edited by Chris Vavra, Control Engineering, www.controleng.com 

controleng.com/process

controleng.com/hmi



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.