SEARCH Archives
Loading
Sponsored by:

ARC president: Pick up the pace of technology adoption

Rapid growth of devices, technology use requires faster implementation on plant floor.

Bob Vavra

02/12/2013


The speed of manufacturing information adoption is accelerating, and those who stay on the sidelines will find themselves falling further behind a fully-optimized plant. That was the keynote message from ARC Advisory Group president Andy Chatha at the 2013 ARC Forum in Orlando, on Feb. 12.

“All of you have data, gathering information in real time. The challenge is that we haven’t had good tools to analyze that data,” Chatha told more than 600 attendees at the ARC event. “Now we do have powerful analytical tools. We think information-driven manufacturing is the way to leverage the information. You have to be able to make sense out of the information.”

Chatha noted that the accelerated use of smart devices, the pervasive influences of Wi-Fi and cloud computing and the connective nature of devices all have created enormous opportunities to leverage the data now available on the plant floor.

“It’s much easier now to get devices connected and add intelligence,” Chatha said. “In my view, one thing that is happening is that the cost of adding intelligence is coming way down. Companies should be adding intelligence to all equipment. Data should be moving toward some sort of cloud.”

But the key for manufacturing to take advantage of this technology is speed, and Chatha noted manufacturing is slow to embrace speed.

“Technology constantly is changing. Most manufacturing companies are very conservative. They only employ technology when it has been well-proven,” he said. “That strategy worked fine in the past. New technologies are more disruptive, and they are moving faster. Now you have to start testing technologies faster. If you are not testing technologies, it may take you too long to catch up. You’ve got to start moving a little faster toward developing new technologies.”

Chatha sees a continuing evolution of the plant floor processes.

“With powerful tools, you can look at all processes in the plant and information outside the plant—in your supply chain, for example,” Chatha said. “Look at how analyzing much larger amounts of information can optimize the performance of the plant.”

Developing such a plan will require new relationships from existing suppliers. “The automation business already is moving toward being more of a service business,” Chatha said. “One model is looking at signing some sort of performance-based service agreement with suppliers, based on key metrics. Systems are becoming more complex, and it is more difficult for manufacturers to upgrade them and manage them. “

ARC World Forum, is Feb. 11-14, in Orlando, Fla.http://www.arcweb.com/



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.