American Aerogel Expansion of Production Capacity

System overhaul: American Aerogel Expansion of Production Capacity; Optimation

08/09/2012


Optimation mechanics, pipefitters, and electricians installed and expanded service lines to increase production capacity.Project name: American Aerogel Expansion of Production Capacity

Location: Rochester, N.Y.

Firm name: Optimation

Project type, building type: System overhaul, manufacturing

Project duration: 1.7 years

Project completion date: Sept. 30, 2008

Engineering challenges

American Aerogel, a company developing and manufacturing proprietary Aerogel insulation products, had been growing rapidly and needed to expand its production capabilities. Because demand for its product was so high, American Aerogel’s 24/7 operation required new equipment with process improvements to increase production and improve efficiencies. Because American Aerogel’s products are made with a proprietary one-of-a-kind aerogel called Aerocore, maintaining confidentiality of the products’ chemical makeup and patented manufacturing processes was/is of the utmost importance. Optimation continues to honor this confidentiality.

Solutions

American Aerogel needed to expand production capabilities to meet a growing demand for its insulation product.American Aerogel brought Optimation in early on to assess the existing production equipment, processes, and available space to increase capability to remove and recover solvents from its products. Optimation developed drawings with the layout of the new and relocated production equipment and associated services. Optimation’s skilled trades team, comprised of millwrights, pipefitters, riggers, and electrical and instrumentation mechanics, completed installation of all production equipment and associated components. In addition to installing new equipment, mechanics made modifications to existing services to increase capacity. These services included electricity, steam, compressed air and nitrogen supplies, and condensate return and process vapor recovery. Optimation also assembled and installed all instrumentation/control cabinets, and led debug and startup of all installed systems. After this project was completed, production capacity increased significantly. The addition of instrumentation and improved access to the process information improved productivity and product quality. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.