This rendering shows the food court and public areas under the skylights of Agora Mall.Project name: Agora Mall

Location: Santo Domingo, DR

Firm name: Triad Consulting

Project type, building type: New construction, retail

Project duration: 3 years

Project completion date: Nov. 17, 2011

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $1.45 million

Engineering challenges

The electric grid in this location is notorious for outages, requiring a design offering 100% backup power to the building to support ventilation and life-safety systems, and provide power to all the high-end retail stores. This project was designed to be a U.S. Green Building Council LEED certified building, which required sustainability to be incorporated into the design with energy conservation measures. The site had restricted space around the building and the roof was designed with transparent skylights that severely limited space for HVAC equipment. Additionally, with a majority of the parking spaces being underground levels, the need for continuous ventilation further increased this equipment. With the project location being in a volatile seismic zone and high wind zone, more design constraints were imposed limiting our options.

Solutions

To deal with these design constraints, the HVAC design utilized a central water system supplying local water-cooled HVAC units, with air cool units serving the public and food courts. Pump staging and VFDs were used to vary water supply to meet the partial load conditions and provide a more energy-efficient system. In order to deal with the backup power requirements and limited space, the generators were located in the underground areas with exhaust and cooling water systems skillfully routed to the roof level and hidden from view. The supply air is routed underground utilizing a ductwork system powered by a set of in-line fans, and the exhaust air is removed via strategically located air shafts hidden from view and powered by dedicated up-blast fans.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.